Ecological channel revetment and construction method thereof
A revetment and waterway technology, applied in botanical equipment and methods, waterway systems, planting substrates, etc., can solve problems such as revetment collapse, waterway revetment aging, and impact on ship navigation safety, so as to prevent saline-alkali erosion and improve structural safety performance, improving structural stability and permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as figure 1 As shown, an ecological waterway barge includes a barge body 1, which is located at the slopes on the left and right sides of the channel. The revetment body 1 includes an immersion separation section 2, a green infiltration section 3, and a plant planting section 4 formed one by one from the corner of the embankment to the top of the embankment; under normal water levels, the immersion separation section 2 is generally immersed below the water surface of the channel. To infiltrate the channel water body and block the penetration of salt and alkali components in the channel water body, the green infiltration section 3 and the plant planting section 4 are located above the water flow surface of the channel, and both play the role of infiltrating the rainfall water body and decorating the channel revetment. In coastal or inland rivers with high saline-alkali conditions, it is difficult for the saline-alkali components in the channel water to penetrate into ...
Embodiment 2
[0051] Such as Figure 5 As shown, an ecological waterway revetment construction method includes the following steps:
[0052] S1. Excavate the bank body 1 according to the design standards and requirements of the waterway and bank, that is, excavate the bank body 1 on both sides of the waterway.
[0053] S2. Arrange the planting layer 411, the filter layer 412, the drainage layer 413, the moisturizing layer 414, the root layer 415, and the anti-leakage layer 416 from top to bottom in the pier body 1, and water storage in the pier body 1 Pool 61, and excavate a water storage pipeline 62 connecting the storage and drainage layer 413 and the reservoir 61.
[0054] S3. Arrange the straw permeable layer 222, the partition wall 223, the distiller's grain permeable layer 221 and the inner support cage 24 at the bank corner of the barge body 1 in turn toward the center of the channel, and pour green concrete outside the inner support cage 24 Formed concrete surface layer 23; prefabricated...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com