[0019] The present invention will be described in further detail below in conjunction with the accompanying drawings and examples.
[0020] see figure 1 , the present invention is a construction method of a steel-concrete composite girder deck, which is carried out as follows:
[0021] A. Lifting and welding the sections of the first steel box girder 1 and the second steel box girder 2 to form;
[0022] B. A connecting beam 4 is installed between the first steel box girder 1 and the flange 3 inside the second steel box girder 2
[0023] (1) Process connection holes with a diameter of 22 mm on the flange 3 inside the first steel box girder 1 and the second steel box girder 2 respectively. The center of the connection hole is 15 cm away from the inner edge of the flange 3 . Center distance is 60 cm apart;
[0024] (2) Make the connecting beam 4, the connecting beam 4 is composed of the first channel steel 4-1, the second channel steel 4-2 and the connecting plate 4-3, the fir...