Unlock instant, AI-driven research and patent intelligence for your innovation.

Tailing sand consolidation process suitable for ASP flooding oil-water well fracturing

A ternary composite and water well technology, which is applied in the direction of wellbore/well components, production fluid, earthwork drilling and production, etc., can solve the problems of complex sand-fixing process and high cost, achieve simple sand-fixing process, improve construction efficiency, and The effect of risk reduction

Inactive Publication Date: 2020-07-10
DAQING OILFIELD CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a trailing sand consolidation process suitable for the fracturing of ASP flooding wells, so as to solve the problems of complex and high cost in the existing resin liquid sand consolidation process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tailing sand consolidation process suitable for ASP flooding oil-water well fracturing
  • Tailing sand consolidation process suitable for ASP flooding oil-water well fracturing
  • Tailing sand consolidation process suitable for ASP flooding oil-water well fracturing

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0021] Example 1: During the process of tailing alkali-resistant coated sand 2 in Well A, after the interval fracturing is completed according to the construction procedure table, the trailing alkali-resistant coated sand 2 is 1.5m 3 , 5m for extrusion cracking liquid 3 , Diffusion pressure for 10 minutes after extrusion. Ordinary proppant 3 is arranged at the front end of the fracture 4, and the alkali-resistant coated sand 2 is concentrated at the end of the fracture 4, near the port ( figure 1 , 2 ). at 0.6m 3 / min construction displacement injection liquid solubilizer 3m 3 , followed by pumping 3m 3 The fracturing fluid is alternately squeezed, and the diffusion pressure is 30 minutes, and the sand consolidation process in this layer is completed (Table 2). When performing sand cementing in the next layer, repeat the above steps. After the fracturing of the whole well is completed, shut down the well and spread the pressure for 150 minutes. After the pipe string is m...

Embodiment 2

[0024] Example 2: During the process of tailing alkali-resistant coated sand 2 in Well B, after the interval fracturing is completed according to the construction procedure table, the trailing alkali-resistant coated sand 2 is 3m 3 , 3m for squeeze cracking liquid 3 , after squeezing, spread the pressure for 20 minutes. Ordinary proppant 3 is arranged at the front end of the fracture 4, and the alkali-resistant coated sand 2 is concentrated at the end of the fracture 4, near the port ( figure 1 , 2 ). at 0.6m 3 / min construction displacement injection liquid solubilizer 3m 3 , followed by pumping 3m 3 The fracturing fluid was replaced and the pressure was diffused for 20 minutes, and the sand consolidation process in this layer was completed (Table 3).

[0025] Table 3 Sand cementing process at the end of Well B

[0026]

[0027] Sand-fixing construction technology is the same as embodiment 1.

Embodiment 3

[0028] Example 3: During the process of tailing the alkali-resistant coated sand 2 in Well C, after the interval fracturing is completed according to the construction procedure table, the trailing alkali-resistant coated sand 2 is 2m 3 , 4m for extrusion cracking liquid 3 , Spread the pressure for 15 minutes after squeezing. Ordinary proppant 3 is arranged at the front end of the fracture 4, and the alkali-resistant coated sand 2 is concentrated at the end of the fracture 4, near the port ( figure 1 , 2 ). at 0.6m 3 / min construction displacement injection liquid solubilizer 3m 3 , followed by pumping 3m 3 The fracturing fluid is alternately squeezed, and the diffusion pressure is 25 minutes, and the sand consolidation process in this layer is completed (Table 4).

[0029] Table 4 Sand cementing process table at the end of Well C

[0030]

[0031] Sand-fixing construction technology is the same as embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of oil field oil extraction engineering, in particular to a tailing sand consolidation process suitable for ASP flooding oil-water well fracturing. According to the tailing sand consolidation process suitable for ASP flooding oil-water well fracturing, the problem that the fracturing validity period is short due to closure failure of cracks near a shaftcaused by a tailing resin liquid sand consolidation process is solved, alkali-resisting precoated sand is added in a tail mode after single-slit fracturing, a liquid solubilizer is injected in a small displacement mode, and a percolating artificial well wall with certain strength is formed at a fracturing slit end opening; and the ailing sand consolidation process suitable for ASP flooding oil-water well fracturing can effectively prevent the migration of a proppant in the slit and prolong the fracturing validity period, and the process has the advantages of being simple in on-site construction process, low in cost, good in popularization prospect in a ASP flooding block and the like.

Description

technical field [0001] The invention relates to the technical field of oil production engineering in oilfields, in particular to a trailing sand consolidation process suitable for fracturing of three-element compound oil flooding water wells. Background technique [0002] At present, the technological process of resin liquid sand consolidation in the ASP flooding block is as follows: After spreading the pressure → inject clear pore liquid (salt water) → squeeze resin liquid → inject spacer liquid → inject curing agent containing hydrochloric acid → inject pore-increasing liquid → press Crack the lower layer. Therefore, the existing sand-fixing process in the ASP flooding block is complicated and the cost of sand-fixing is high. The hydrochloric acid contained in the sand-fixing agent is a hazardous chemical, which is strictly controlled, and there are great potential safety hazards in on-site construction. Contents of the invention [0003] The purpose of the present inve...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B43/26E21B43/267E21B33/13
CPCE21B33/13E21B43/261E21B43/267
Inventor 周万富王俐超王飞张新月刘向斌王庆国孙国辉
Owner DAQING OILFIELD CO LTD