A technology of shallow burial and underground excavation and construction methods, which is applied to tunnels, earthwork drilling, underwater structures, etc., and can solve problems such as difficult implementation, reduced construction efficiency, and impact on construction organization, so as to achieve mature construction technology and improve construction efficiency. Efficiency, the effect of construction organization optimization

Inactive Publication Date: 2015-05-20
中铁隧道局集团有限公司市政工程公司
View PDF5 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This construction method has the following defects: 1. The construction risk is relatively high. In the event of water gushing or collapse, the river water will flow backward into the tunnel, which will not only affect the downstream section of the river, but is more likely to submerge the entire tunnel, which will bring new problems to the tunnel construction. Catastrophic impact; 2. Choose conservative construction methods, reduce the cycle footage, slow down the construction progress, and increase the time cost; 3. The space in the cave is narrow, and the construction operation of the reinforced support system is inconvenient, which affects the construction organization and reduces the construction efficiency. And the construction quality is difficult to guarantee
However, this method also has the following defects: 1. River diversion may involve demolition, pipeline movement, etc., which requires the coordination and cooperation of multiple departments such as the government, and the processing costs are high, making it difficult to implement; Flood control and drainage or flushing ability will adversely affect the lives of nearby residents, and cannot prevent the impact of upstream river water seeping along the riverbed in the horizontal direction on the tunnel construction site; 3. River bottom treatment, before the river bottom treatment still needs to be done Temporary cofferdams are poorly observable after river bottom treatment, and problems cannot be discovered and remedied in time. Once the river bottom treatment measures fail, it will seriously affect the tunnel construction; 4. Stratum precipitation, stratum precipitation can easily cause stratum subsidence Threat to the safety of adjacent buildings, and the requirements for daily maintenance and management are high, consuming a lot of material resources and manpower
[0006] In the prior art, in the construction of shallow-buried underground tunnels that pass through rivers, usually more attention is paid to taking treatment measures in the cave to strengthen the support in the cave. Consider comprehensive treatment measures outside the cave

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Safe and fast construction method of down-traversing river shallow depth bored tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] Take the construction of a shallow-buried tunnel under a river that has been completed as an example:

[0028] See attached figure 1 , the excavation section of the shallow buried tunnel 1 passing under the river is 101㎡, which is a long-span tunnel, excavated by the CRD method, and the tunnel top is about 9.3m away from the river bottom. The width of the downstream river is 25m, the elevation of the river bottom is -0.2m, and the elevation of the river bank is 4.6m.

[0029] 1) In the dry season, close the upstream sluice and build a clay cofferdam 4. The cross section of the clay cofferdam 4 is trapezoidal. The height of the clay cofferdam is 2.5 meters. The clay cofferdam is narrow at the top and wide at the bottom. The side wall of the tunnel is 20m, and the water in the clay cofferdam is drained to form a dry construction site, and a 100mm reinforced concrete panel 5 is poured on the face of the clay cofferdam; 6 diversion steel pipes 3 with a diameter of Φ1000 ar...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a safe and fast construction method of a down-traversing river shallow depth bored tunnel. The method includes the steps that on the two sides of the tunnel, the upstream and the downstream of a river are each provided with a clay cofferdam so that the river can be intercepted, and a dry river bed is formed in a tunnel construction area; the two constructed clay cofferdams are communicated through a flow guiding pipe, and therefore upstream river water and downstream river water can flow; the two sides of the tunnel are each provided with at least one row of Larsen steel plate piles, and the tunnel is excavated after the Larsen steel plate piles extend to a river bank in the axial direction of the tunnel. The clay cofferdams, the flow guiding pipe and the Larsen steel plate piles are matched coordinately and comprehensively utilized, and tunnel construction safety is guaranteed by the clay cofferdams, the flow guiding pipe and the Larsen steel plate piles jointly. The method is good in construction safety and high in construction efficiency, treatment measures are flexible, pertinent adjustment can be performed according to different geological conditions, and manufacturing cost of projects is saved as much as possible on the premise that safety is guaranteed.

Description

technical field [0001] The invention discloses a safe and rapid construction method for a shallow-buried underground excavation tunnel passing through a river, and belongs to the technical field of tunnel construction. Background technique [0002] With the development of tunnel engineering, more and more tunnels need to pass through rivers. In shallow buried tunnels, the place where the river passes below is generally the key control point of the project. Large-scale water seepage may even cause instability and collapse of the working face. How to ensure construction safety and improve construction efficiency needs to be solved urgently. [0003] In the construction of shallow buried tunnels that cross rivers, there are usually two construction methods. The first method is to excavate the tunnel only by strengthening the support in the tunnel without changing the current status of the river; the second method is to use cut-off or The river is diverted, and then tunnels ar...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/04E02D19/18E21D9/00
CPCE02D29/077E02D19/04
Inventor 赵春华王越辉赵军邓建林卢春林田精斐陈昌连
Owner 中铁隧道局集团有限公司市政工程公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products