The protection construction method based on the large rigid box culvert under the power pipe gallery
A technology of power pipe gallery and construction method, applied in the direction of protection device, cable installation, infrastructure engineering, etc., can solve problems such as box culvert emptying, rigid box culvert existing safety, affecting line operation, etc., to improve backfill density , Ensure the quality of backfill and shorten the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] Best practice:
[0035] Refer to attached figure 1 The protection construction method of the present invention based on the large rigid box culvert passing under the power pipe gallery is carried out based on the support protection device. The support protection device includes a support assembly, a jacking assembly and a pipe shed assembly, wherein the support assembly includes Four steel pipe piles 1 and the supporting steel plate 2 installed on the top surface of each steel pipe pile 1, the top of the steel pipe pile 1 and the supporting steel plate 2 are welded to form a whole as the foundation of the jacking assembly; the supporting steel plate 2 is a square steel plate A number of bolt holes matching the base of the jack 3 with an axial force meter are reserved in the center; a number of bolt holes matching the base of the steel circular tie rod 4 are reserved near the edge of the support plate 2 along an axis passing through the shaft center.
[0036] The jackin...