The Construction Method of Excavating the Station Structure by Tunnel First and Then the Station Pipe-curtain Pile Method
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- HAINAN UNIV
- Publication Date
- 2022-03-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of tunnel construction, in particular to a construction method for excavating a station structure by tunneling first and then station pipe curtain hole pile method. Background technique
[0002] In the construction of urban subway projects, due to the difficulty and slowness of the demolition work in the central area of ββthe city, the demolition and relocation cannot be completed on time. As a result, the construction of the subway station section cannot be started according to the planned construction period, or even seriously lags behind, which affects the realization of the goal of running through the entire line. It is necessary to use The tunnel will be constructed first and then the station will be constructed. Most of the existing construction methods are the tunnel first and then the station combined with the open-cut method or the mine method, but the open-cut method will greatly affect the environmental fac...