A performance evaluation test platform and method for non-contact transmission system
A non-contact transmission and test platform technology, applied in the field of oil drilling, can solve the problems of inability to effectively explain the operating performance, lack of a non-contact transmission system performance test platform, and failure to meet engineering reliability and other problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] As a specific embodiment of the system of the present invention, such as figure 1 , discloses a performance evaluation test platform for a non-contact transmission system, including a remote monitoring platform, an electric control cabinet, and a high-temperature and high-pressure test chamber for simulating an underground high-temperature and high-pressure environment, and the temperature and pressure are adjustable; the high-temperature The high-voltage test chamber includes an electric heating furnace and an air booster pump. The high-temperature and high-pressure test chamber is equipped with a rectification and adjustment circuit, a signal loading circuit and a transmitting coil located in the underground environment at the input end of the non-contact transmission system to be tested, and a The receiving coil and signal receiving circuit of the downhole environment; the high temperature and high pressure test chamber is also provided with a rotating platform for dr...
Embodiment 2
[0039] As a specific embodiment of the testing method of the present invention, the technical solution corresponding to the above-mentioned embodiment 1 system includes the following steps:
[0040] Installation and setting steps, load the non-contact transmission system to be tested on the test platform, set the test temperature and pressure in the high temperature and high pressure test chamber; and according to the prior value of the load characteristics of the actual working environment of the non-contact transmission system to be tested, Adjust the parameters of the adjustable resistance, adjustable capacitance and / or adjustable inductance in the simulated load to simulate the actual load state; this test method is to test the performance indicators of the non-contact power / signal transmission system, the main test is different Working performance indicators under temperature, different pressures, different angles, and different loads, the four parameters can be adjusted a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


