Battery Pack Top Squeeze Test Method
A test method, battery pack technology, applied in the direction of applying stable tension/pressure to test material strength, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] like figure 1 , The top of the battery pack of the present embodiment is the extrusion test method, comprising the steps of:
[0037] Pretreatment Battery pack: adjust the battery pack, the battery pack insulation resistance ≥100Ω / V, the leakage current insulation test ≤10mA; state of charge of the battery pack within a range of 0% -100% range. Maintaining the voltage of the battery pack factory condition. Adjust the ambient temperature, the ambient temperature before the test is 18-28 degrees.
[0038] Test sample preparation: after adjusting the battery pack is fixed to the fixing means, it is determined whether or not the battery pack with a liquid cooling system, if having, filled with coolant in the battery pack and closure. Determining the location of the top and pressing the test point marked on an outer surface of the battery pack. If the battery pack has a weak pre-set position one or more than one, select the weak position of the battery pack as a top pressing a...
Embodiment 2
[0058] The battery pack according to the present embodiment the top push test method, comprising the steps of:
[0059] Pretreatment Battery pack: adjust the state of charge of the battery pack 50%, before the positive electrode of the battery pack housing 11 M test, the negative electrode of the casing 11 M, the total voltage is 321.2V, (for housing the positive electrode 12 m, the negative electrode of the casing 12 m) prior to testing the battery pack insulation test leakage current was 4.59mA.
[0060] 2) Test Sample Preparation: after pretreatment battery pack fixed to the fixing means, the cooling liquid filled in the liquid cooling system and the battery pack block, to determine the position of the top and pressing the test point marked on the surface of the housing of the battery pack out, if there is more than one position of weakness, the weak position of the battery pack to select a marked. In turn squeezed.
[0061] 3) Test platform structures: The top of the extrusion...
Embodiment 3
[0066] The battery pack according to the present embodiment the top push test method, comprising the steps of:
[0067] Pretreatment Battery pack: adjustment of state of charge of the battery pack 90%, the total voltage before testing 385.3V, (positive for housing 126MΩ, the negative electrode of the housing 127MΩ), the battery pack before testing insulation test leakage current is 6.5mA .
[0068] 2) Test Sample Preparation: after pretreatment battery pack fixed to the fixing means, the cooling liquid filled in the liquid cooling system and the battery pack block, to determine the position of the top and pressing the test point marked on the surface of the housing of the battery pack out, if there is more than one position of weakness, the weak position of the battery pack to select a marked. In turn squeezed.
[0069] 3) Test platform structures: The top of the extrusion head for the extrusion test the selected φ150mm ball head extrusion head mounting plate is fixed on the extru...
PUM
| Property | Measurement | Unit |
|---|---|---|
| current | aaaaa | aaaaa |
| current | aaaaa | aaaaa |
| current | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


