Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM-based factory processing management method and device, equipment and medium

A management method and factory technology, applied in data processing applications, special data processing applications, instruments, etc., can solve problems such as low project construction efficiency

Pending Publication Date: 2020-10-23
CHINA MINSHENG ZHUYOU
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a BIM-based factory processing management method to solve the technical problem of low project construction efficiency existing in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based factory processing management method and device, equipment and medium
  • BIM-based factory processing management method and device, equipment and medium
  • BIM-based factory processing management method and device, equipment and medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The flow chart of a specific embodiment of the BIM-based factory processing management method provided by the present invention is as follows figure 1 As shown, the method includes:

[0042] Step S101: Obtain the BIM design drawing and BIM building model corresponding to the project task; in the field of prefabricated buildings, the project task is composed of different components, after obtaining the project task, you can obtain the BIM design corresponding to the project task Drawings and BIM building models.

[0043] As a specific implementation, please refer to figure 2 , step S101 includes:

[0044] Step S1011, receiving the project task input by the user;

[0045] Step S1012, according to the project task, search the database to obtain the corresponding BIM design drawing and BIM building model.

[0046] Specifically, the terminal can receive the project task input by the user, and then search the corresponding BIM design drawing and BIM building model from t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM-based factory processing management method. The BIM-based factory processing management method comprises the following steps: obtaining a BIM design drawing and a BIM building model corresponding to a project task; performing component splitting on the BIM design drawing according to the BIM building model, obtaining component machining information, and the component machining information comprises component types and a machining list; determining a corresponding processing factory according to the type of the component; obtaining component demand information corresponding to the type of the component, wherein the component demand information comprises the number of the components and demand time; and sending the processing list, the number and the required time of the components to the corresponding processing factory. The invention further provides a BIM-based factory processing management device and equipment and a medium. According to the scheme, the machining factories can machine the components according to the obtained information, it is ensured that all the machining factories can deliver the components on time, and therefore the construction efficiency of a project is improved.

Description

technical field [0001] The invention belongs to the technical field of prefabricated buildings, and in particular relates to a BIM-based factory processing management method, device, equipment and medium. Background technique [0002] The prefabricated building refers to the addition of manufacturing links between design and construction. The prefabricated factory manufactures various components required for the building based on the design of the designer, and then transports the components to the site for assembly. Compared with traditional buildings , Prefabricated buildings can improve the efficiency of housing construction and reduce dust pollution on the construction site. At present, when producing components for a project, different components correspond to different assembly factories for production, and the various assembly processing factories cannot communicate with each other in a timely manner, which may easily cause the components to be delivered in time, whic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06Q50/08
CPCG06F30/13G06Q50/08
Inventor 李全维刘海明聂艳辉