Problems solved by technology

[0005] The purpose of the present invention is to provide a prefabricated building construction scheme based on BIM technology, which aims to solve the problem that the traditional two-dimensional design cannot solve the collision problem between components, which leads to the reduction of assembly efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated building construction scheme based on BIM technology
  • Fabricated building construction scheme based on BIM technology
  • Fabricated building construction scheme based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary and are intended to explain the present invention and should not be construed as limiting the present invention.

[0022] see figure 1 , the present invention provides a prefabricated building construction scheme based on BIM technology, including:

[0023] S101 Establishing databases of different structural parts in BIM applications;

[0024] see figure 2 , the specific steps include:

[0025] S201 importing an existing 3D building model into a BIM application;

[0026] Import the structural design data such as structural drawings provided by the construction unit or design institute into the BIM software, and automatically create a 3D ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a fabricated building construction scheme based on a BIM technology. The fabricated building construction scheme comprises the steps: establishing databases of different structural parts in a BIM application; collecting environment and geographic information data and using BIM drawing to obtain an environment BIM model; selecting different structural parts and environment BIM models for preliminary combination, and obtaining a combined model; determining an overlapping interference area and correcting the size of the corresponding structural member; performing combiningagain, carrying out mechanical verification, and modifying related sizes and materials; and designing an on-site construction process based on the BIM. Standardized design is carried out on a structural member; different structural parts are selected for preliminary combination, an overlapping interference area is used for size correction, and finally mechanical verification is carried out, so that it is ensured that all the structural parts are assembled without interference and collision, the mechanical strength required by design can be met after organization is completed, and the assembling efficiency can be improved.

Description

technical field [0001] The present invention relates to the technical field of architectural design, in particular to a construction scheme of a prefabricated building based on BIM technology. Background technique [0002] BIM is a building information modeling technology, a digital tool applied to engineering design, construction, and management, and it is used to describe computer-aided design that is mainly based on three-dimensional graphics, object-oriented, and related to architecture. [0003] Prefabricated buildings are buildings assembled from prefabricated parts and components on site. According to the form and construction method of prefabricated components, they can be divided into five types: block buildings, plate buildings, box buildings, skeleton plate buildings, and riser-rise buildings. , with the development of modern industrial technology, building houses can be manufactured in batches like machine production, as long as the prefabricated house components...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06T17/00G06F30/17E04G21/14E04G21/00G06F119/14
CPCG06F30/13G06T17/00G06F30/17E04G21/00E04G21/14G06F2119/14
Inventor 王大伟雍洪宝丁百湛李保亮沈建周晓方
Owner HUAIAN TESTING CENT FOR CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products