Method and system for judging disappearance of single-phase ground fault in neutral point non-effectively grounded system
A single-phase grounding fault, non-effective grounding technology, applied in short-circuit testing, instruments, measuring devices, etc., to achieve the effect of low operational risk and avoid long-term operation of the system with faults
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] This embodiment provides a system for judging the disappearance of a single-phase ground fault in a non-effective neutral point grounding system. A three-phase switch is installed on the busbar of the substation. One end of the three-phase switch is grounded through an adjustable resistance, and the resistance of the grounding resistance is adjusted in the substation Value, to judge whether the fault disappears, can quickly, timely and reliably judge whether the actual fault of the line disappears.
[0036] Please refer to the attached figure 1 , the neutral point non-effective grounding system single-phase ground fault disappearance judgment system includes a three-phase switch installed at the busbar of the substation, an adjustable resistor, a current transformer and a control system, one end of the three-phase switch is connected to the three-phase substation The bus bar is connected, and the other end is grounded through an adjustable resistance. A high-precision c...
Embodiment 2
[0045] This embodiment provides a method for judging the disappearance of a single-phase ground fault in a neutral point non-effectively grounded system based on an adjustable resistor. Analysis and comparison of the values can quickly and reliably determine whether the actual fault point has disappeared, avoiding long-term operation of the system with faults, and also avoiding the impact on power supply equipment and power grid operation caused by blind testing through the operation of the grounding switch in the station.
[0046] Please refer to the attached figure 2 The method for judging the disappearance of a single-phase ground fault in a neutral point non-effectively grounded system includes the following steps:
[0047] S101, install a three-phase switch capable of split-phase operation at the three-phase busbar in the 10kV (or 35kV) substation. One end of the three-phase switch is connected to the three-phase busbar of the substation, and the other end is connected...
Embodiment 3
[0075] This embodiment provides an example of analyzing the two situations of permanent single-phase ground fault and transient single-phase ground fault respectively by adopting the method for judging the disappearance of single-phase ground fault in neutral point non-effectively grounded system proposed in the above embodiment.
[0076] (1) The permanent single-phase ground fault is analyzed by using the method of judging the disappearance of the single-phase ground fault in the neutral point non-effectively grounded system.
[0077] 3 minutes on the 7km long line L 1 The permanent single-phase grounding occurs through the 3Ω transition resistance, and the control system quickly controls the A phase of the three-phase switch to close after detecting the change of the bus three-phase voltage, forming a fixed grounding point in the substation. Calculate the current of the adjustable resistance branch 5 seconds after the failure, and adjust the resistance value according to the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com