Air pressure balance shield tunneling machine and construction method
A technology of air pressure balance and shield machine, which is applied in the direction of earth drilling, mining equipment, tunnels, etc., which can solve the problems of large construction power consumption, large surface subsidence, and secondary wear of tools, so as to achieve good promotion prospects and reduce subsidence , Reduce the effect of secondary wear
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as figure 1 As shown, a kind of air pressure balance shield machine, the front shield partition 4 of the air pressure balance shield includes two parts: the air pressure chamber 29 and the slag storage chamber 22, wherein the air pressure chamber 29 is between the front shield partition 4 and the soil chamber partition Between the upper space and the front space of the soil cabin partition, the slag storage compartment 22 is the lower space between the front shield partition 4 and the soil cabin partition;
[0038] A hob and a slag inlet are arranged on the cutterhead 1, and the slag inlet is connected to the slag chute 25 provided in the cutterhead 1, the cutterhead support arm 21 is fixed to the soil compartment spacer 35, and the cutterhead support arm 21 is connected to the main drive 20, The cutter head support arm 21 rotates under the drive of the main drive 20;
[0039]The slag scraper 24 is installed on the cutter head 1, and the slag scraper 24 is used to...
Embodiment 2
[0042] Such as image 3 As shown, the soil compartment partition includes an outer soil compartment partition 23 and a middle soil compartment partition 26, and the outer soil compartment partition 23 and the middle soil compartment partition 26 are respectively connected to the front shield 2 (or can be described as the front shield 2). fixed support) is fixed, and between the outer soil cabin partition 23 and the middle soil cabin partition 26 is the soil cabin partition ring 35.
[0043] For barometric chamber 29 and slag storage chamber 22, it can be described as: front shield partition 4 between front shield 2 and middle shield 6 divides front shield 2 internal space by outer soil compartment partition 23, middle part soil compartment partition 26 and soil The cabin partition ring 35 is divided into two parts, and the front and the middle part soil cabin dividing plate 26 tops are air pressure chambers 29, and the rear lower space of the middle part soil cabin dividing pl...
Embodiment 3
[0048] A water spray port is arranged on the cutter head 1, and the water spray port is connected to a water pump through a pipeline, and the water pump communicates with the water storage device. Spray water in front of the cutter head 1 for dust reduction and cooling. The water spraying step is set before the cutter head 1 starts to rotate, and the effect is better.
[0049] The slag tank 28 is an inclined structure, and the inclination angle of the inclined structure is 30°-45°. The tilt direction of the tilted structure can be found in figure 1 , the direction from the cutter head 1 to the main drive 20 is inclined from top to bottom.
[0050] The shield machine includes front shield 2, middle shield 6 and shield tail 11. The front shield partition 4 is arranged between the front shield 2 and the middle shield 6, and the front shield partition 4 is provided with a slag inlet 34, which is connected with the entrance of the screw conveyor 15.
[0051] A hinged seal 8 is ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


