Gas burning shaft kiln damping-down and re-blowing system and control method
A control method and a technology of shutting down and recovering air, which are applied to the furnace control device, furnace cooling, furnace, etc., and can solve the problems of gas poisoning, waste time, waste power, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] see figure 2 , a gas-fired vertical kiln resting and returning air system 1b, which includes: a gas-fired vertical kiln 10, a gas surrounding pipe 20, an air surrounding pipe 40, a nitrogen pipe, a cold air pipe 60, an air induction pipe 70 and a control system (not shown in the figure) ).
[0053] The gas-fired shaft kiln 10 has sleeve-type burners 11 evenly arranged along the periphery of the kiln body of the gas-fired shaft kiln 10, and each burner 11 has a gas shut-off valve and an auxiliary gas shut-off valve, wherein the gas shut-off valve and the auxiliary gas shut-off valve The gas shut-off valve is normally open.
[0054] The gas surrounding pipe 20 is arranged around the gas-fired shaft kiln 10 and can be selectively communicated with each burner 11 through a gas shut-off valve. Drain tube.
[0055] Wherein, the gas valve includes a first gas valve 22 and a second gas valve 23. Optionally, the gas main pipe 21 can be preheated through a heat exchanger 30, ...
Embodiment 2
[0086] Using the gas-fired vertical kiln shutdown and re-air system provided in Example 1 as a framework, a specific gas-fired vertical kiln shutdown and re-air control method is run.
[0087] Among them, the diameter of the nitrogen surrounding pipe is Φ150. Set the parameters of nitrogen purge gas surrounding pipe and air surrounding pipe during planned wind shutdown and emergency wind shutdown: pressure 0.5MPa, flow rate 80m 3 / min, purge time 10s.
[0088] Use the original control system of the gas fired kiln to compile the automatic control program: please refer to Figure 4 , when the “planned wind off” button is pressed to trigger the planned wind off process, the PLC will issue a command to automatically close the gas valve and open the second relief valve within 5s, then close the air valve and cold air valve within 5s, and open the first purge valve and the second purge valve, purge the gas surrounding pipe and the air surrounding pipe for 10s each, close the first...
Embodiment 3
[0092] Using the gas-fired vertical kiln shutdown and re-air system provided in Example 1 as a framework, a specific gas-fired vertical kiln shutdown and re-air control method is run.
[0093] Among them, the diameter of the nitrogen surrounding pipe is Φ200. Set the parameters of nitrogen purge gas surrounding pipe and air surrounding pipe during planned wind shutdown and emergency wind shutdown: pressure 0.6MPa, flow rate 100m 3 / min, purge time 9s.
[0094] Use the original control system of the gas-fired kiln to compile the automatic control program: when the "planned wind shutdown" button is pressed to trigger the planned wind shutdown process, the PLC will issue an instruction to automatically close the gas valve within 6s and open the second relief valve, and then within 6s Close the air valve and cold air valve internally, open the first purge valve and the second purge valve, purge the gas surrounding pipe and the air surrounding pipe for 9s, close the first purge va...