Shield working well connector drainage structure and construction method thereof
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUANGZHOU METRO DESIGN & RES INST
- Publication Date
- 2020-12-29
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of traffic engineering construction, in particular to a shield working well interface drainage structure and a construction method thereof. Background technique
[0002] With the acceleration of urbanization, the urban population, regional planning and urban ecological environment are facing enormous pressure. The development and utilization of urban underground space is the solution to the above pressure. In the process of underground engineering construction, the shield tunnel is to meet the needs of the shield machine. Generally, it is necessary to set up a shield working shaft to realize the origination or reception of the shield. Usually, a shield is reserved on the end wall of the shield working shaft structure. The hole through which the shield machine passes is usually called the shield working well interface. The outsourcing waterproof of the working well is disconnected at the shield working well i...