A kind of steel box girder three-dimensional bridge deck crane and steel box girder hoisting method

A steel box girder and crane technology, which is applied in bridges, bridge construction, walking mechanisms, etc., can solve the problem of single lifting of bridge deck cranes, small size of bridge deck cranes, and difficulty in controlling the installation accuracy of suspension control beam sections. problem, to achieve the effect of improving efficiency, small size, and easy to promote and use

Active Publication Date: 2022-07-05
CHINA RAILWAY FIRST GRP CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a steel box girder three-dimensional bridge deck crane for the deficiencies in the above-mentioned prior art. , the hoisting weight can be adjusted by changing the size and number of steel wire ropes, which solves the problem of single lifting of the bridge deck crane, solves the problem of suspension control under complex linear conditions and the difficulty of controlling the installation accuracy of beam sections. There is a broad market in the field of bridges, which is easy to promote and use

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of steel box girder three-dimensional bridge deck crane and steel box girder hoisting method
  • A kind of steel box girder three-dimensional bridge deck crane and steel box girder hoisting method
  • A kind of steel box girder three-dimensional bridge deck crane and steel box girder hoisting method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] like Figure 1 to Figure 4 As shown, a steel box girder three-dimensional bridge deck crane according to the present invention includes a forward-moving base disposed at the assembly end of the steel box girder, and an assembly disposed on the forward-moving base and cantilevered out of the steel box girder. The crane frame 30 at the end, the top of the cantilevered end of the crane frame 30 is installed with a two-dimensional adjustment mechanism of steel box girder and a balance pulley assembly 38 located outside the two-dimensional adjustment mechanism of the steel box girder. Pulley assembly 37, a hoist 31 is installed on the top of the crane frame 30 away from the cantilever end, and the wire rope 39 of the hoist 31 is connected to the lower pulley assembly 48 through the upper pulley assembly 37 and the balance pulley assembly 38, and the lower pulley assembly 48 It is connected with the spreader 46 through the spreader connecting seat 47 ; the lower pulley assemb...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a steel box girder three-dimensional bridge deck crane and a steel box girder hoisting method. The crane comprises a forward-moving base, a crane frame and a hoist, and a steel box is installed on the top of the cantilevered end of the crane frame. A beam two-dimensional adjustment mechanism and a balance pulley assembly, an upper pulley assembly is installed on the steel box girder two-dimensional adjustment mechanism, and the wire rope is connected to the lower pulley assembly through the upper pulley assembly and the balance pulley assembly; the steel box girder hoisting method includes the steps: 1. 1. Lower the spreader to connect the steel box girder; 2. Lift the steel box girder and adjust the position of the steel box girder in three dimensions; 3. Adjust the slope of the steel box girder; 4. Assemble the steel box girder; 5. Move the base forward to the updated steel Box girder assembly end; 6. Repeat steps 1 to 5 multiple times until the end of the steel box girder assembly. The invention adopts the walking type, the bridge deck crane is small in size, and the hoisting weight can be adjusted by changing the size and number of steel wire ropes, so as to solve the problems of difficult suspension control and beam installation accuracy control under complex linear conditions.

Description

technical field [0001] The invention belongs to the technical field of steel box girder hoisting, and in particular relates to a steel box girder three-dimensional bridge deck crane and a steel box girder hoisting method. Background technique [0002] At present, most of the domestic bridge construction projects use bridge deck cranes to suspend the beams. Due to the differences in the structural types and construction conditions of the beams, the structural types and functional characteristics of the bridge deck cranes are also quite different. The bridge deck crane adopts a box-type main beam, the front end of the main beam tower cantilevered, the main beam, the tower and the cable form a triangular structure with strong bearing capacity, so as to change the force structure and control the lower winding of the cantilever, and the ground support It is fixed by the front fulcrum and the rear anchor point, and the longitudinal moving crane on the main beam completes the lifti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B66C9/10B66C11/18B66C11/22E01D21/00E01D21/10E01D2/04
CPCB66C9/10B66C11/18B66C11/22E01D21/00E01D21/10E01D2/04E01D2101/30
Inventor 贺振华朱卫东邹超汪惺张星韦凡蒋晶党豪李妙张亚鹏刘海涛
Owner CHINA RAILWAY FIRST GRP CO LTD