preparation example Construction
[0041] Preparation of blended pitch (oxidized raw material)
[0042] Heat the first base asphalt and the second base asphalt to melt, then add a certain proportion of the second base asphalt to the first base asphalt, then raise the temperature to 155°C, and stir for 2 hours to obtain the blended asphalt. The results are shown in Table 3. Since the penetration at 25°C is relatively large, the penetration of the blended asphalt at 15°C is tested in Table 3.
[0043] Table 3 Main properties of base asphalt and blended asphalt
[0044]
[0045] Preparation of road asphalt
Embodiment 1
[0047] The blended pitch 2 is heated and melted, then added to a batch oxidation tank, and oxidized by passing in air. Oxidation temperature 230°C, oxidation air volume 0.13m 3 / (kg·h), the oxidation time is 240 minutes.
Embodiment 2
[0049] The blended pitch 3 is heated and melted, then added to a batch oxidation tank, and oxidized by passing in air. Oxidation temperature 240°C, oxidation air volume 0.14m 3 / (kg·h), the oxidation time is 180 minutes.
PUM
| Property | Measurement | Unit |
|---|---|---|
| softening point | aaaaa | aaaaa |
| penetration | aaaaa | aaaaa |
| softening point | aaaaa | aaaaa |
Abstract
Description