Construction method for prefabricated assembly of irrigation channel and cast-in-place concrete coping

A technology of prefabricated assembly and construction method, applied in irrigation pipelines, water conservancy projects, artificial waterways, etc., can solve the problems of weak connection strength between roof and channel, easy to fall off of roof, weak connection strength, etc. Reduce construction workload and solve the effect of water penetration

Active Publication Date: 2021-04-20
ZHEJIANG UNIV CITY COLLEGE
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing concrete prefabrication and assembly technology for irrigation channels has problems such as poor connection and joint water penetration. The existing concrete capping includes cast-in-place concrete capping and prefabricated concrete capping, and there are problems such as weak connection between the capping and the channel.
[0003] Therefore, it is necessary to design a new construction method of prefabricated assembly and cast-in-place concrete roofing for irrigation canals, which can effectively reduce engineering costs, adopt centralized prefabrication and on-site assembly methods for construction, and speed up construction. The cast-in-place concrete roofing formwork system effectively solves the traditional The connection strength between the concrete cap and the concrete channel is weak, and the cap is easy to fall off

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for prefabricated assembly of irrigation channel and cast-in-place concrete coping
  • Construction method for prefabricated assembly of irrigation channel and cast-in-place concrete coping
  • Construction method for prefabricated assembly of irrigation channel and cast-in-place concrete coping

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043]The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principles of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0044] As an embodiment, the present invention provides a construction method for prefabricated assembly of irrigation channels and topping with cast-in-place concrete, comprising the following steps,

[0045] 1) Rapid excavation of U-shaped grooves:

[0046] Such as Figure 1-4 As shown, at the design position, the excavator 1 is used for excavation. When excavating, first use the soil loosening device 2 provided at the front end of the chassis of the excavato...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method for prefabricated assembly of an irrigation channel and a cast-in-place concrete coping. The construction method comprises the steps that 1, an excavator is used for excavation at a designed position, during excavation, a soil loosening device arranged at the front end of a chassis of the excavator is used for scarifying pre-excavated groove soil, and then a U-shaped groove foundation pit is easily excavated in cooperation with a U-shaped excavator bucket; and 2, a cushion layer is arranged after the bottom of a U-shaped groove is compacted, the cushion layer is laid between soil bodies through concrete, and a polytetrafluoroethylene coating is sprayed to the upper portion of the cushion layer. The construction method has the beneficial effects that the groove can be formed at a time under the construction condition of hard soil frozen soil, the slope surface is smooth and flat, the slope top is straight and attractive, and manual finishing is not needed; the prefabricated U-shaped groove can be produced through an assembly line, and the production efficiency is high; the on-site construction workload is reduced; the requirement for hoisting precision is reduced, and the construction difficulty is lowered; and the problems that a connecting gap of the prefabricated U-shaped groove is permeable, a traditional concrete coping and a concrete channel are weak in connecting strength, and the coping is prone to falling off are solved.

Description

technical field [0001] The invention relates to an artificial waterway structure for agricultural soil irrigation and / or drainage, in particular to a construction method for prefabricated assembly of irrigation channels and topping with cast-in-place concrete. Background technique [0002] Concrete irrigation channels are widely used in farmland water conservancy projects. How to quickly realize the prefabricated assembly of concrete irrigation channels and ensure the quality of cast-in-place concrete capping is very important. The existing concrete prefabrication and assembly technology for irrigation channels has problems such as poor connection and joint water permeability. The existing concrete capping includes cast-in-place concrete capping and prefabricated concrete capping, and there are problems such as weak connection between the capping and the channel. [0003] Therefore, it is necessary to design a new construction method of prefabricated assembly and cast-in-pla...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02B13/00E02F5/08E02F5/02E02B5/02
Inventor 刁红国侯梦颖王新泉魏纲崔允亮阙逸琛
Owner ZHEJIANG UNIV CITY COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products