Building construction method of modular house
A construction method and a modular technology, applied in the field of modular houses, can solve problems such as polluted waste, inconvenient disassembly and assembly, and delays in the construction period, and achieve the effects of simple preparation steps, saving pouring time, and saving construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] A construction method for a modular house, the steps of which are:
[0037] S1 Modular house design: Design the 3D model of the modular house to be built, divide it into several main bodies according to the functions of each space in the modular house, and carry out space design and interior decoration design for several main bodies;
[0038] S2 main body production: according to the different functions of several main bodies, select the corresponding load-bearing materials, structural materials and decorative materials, and use the selected materials in the production factory to produce building components, including columns, beams and roof components;
[0039] S3 foundation finishing: After the ground is paved according to the geological monitoring report, the ground is compacted, and ground anchor holes are drilled on the compacted ground according to the preset ground anchor size;
[0040] S4 erecting embedded parts: ring beam infrastructure, and embedding column em...
Embodiment 2
[0047] A construction method for a modular house, the steps of which are:
[0048] S1 Modular house design: Design the 3D model of the modular house to be built, divide it into several main bodies according to the functions of each space in the modular house, and carry out space design and interior decoration design for several main bodies;
[0049] S2 main body production: according to the different functions of several main bodies, select the corresponding load-bearing materials, structural materials and decorative materials, and use the selected materials to produce building components in the production factory. The building components include columns, beams and roof components;
[0050] S3 Foundation finishing: After the ground is paved according to the geological monitoring report, the ground is compacted, and ground anchor holes are drilled on the compacted ground according to the preset ground anchor size;
[0051] S4 erecting embedded parts: ring beam infrastructure, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com