Pile forming construction method for complex geological pile foundation

A construction method and technology of complex geology, applied in infrastructure engineering, sheet pile walls, buildings, etc., can solve the problems of fast wear and tear of mechanical equipment, long construction period, and inability to raise the ash stop surface, and ensure the integrity of the pile foundation. The effect of ensuring the quality of the hole and saving the construction cost

Inactive Publication Date: 2021-06-08
CHINA RAILWAY NO 8 ENG GRP CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Even if reliable measures have been taken to prevent the hole from collapsing during the drilling process, when the underwater concrete is poured, after the pouring reaches a certain height, the ash-stopping surface suddenly drops, and the ash-stopping surface is exposed at the bottom of the conduit, resulting in broken piles;
[0007] Even if holes can be formed, when the concrete is poured underwater, when the ash-stopping surface reaches a large-scale karst cave, a large amount of concrete will flow into the karst cave, and the ash-stopping surface cannot rise for a long time. After a long time, the surface will solidify, resulting in broken piles;
[0008] Other problems encountered: the bored piles in the karst area generally go deep into the rock, the construction period is long, and the mechanical equipment wears out quickly. Often, the wire rope breaks and the drill bit falls into the hole due to careless inspection during the drilling

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pile forming construction method for complex geological pile foundation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0052] The technical solutions in the embodiments of the present application will be clearly and completely described below, obviously, the described embodiments are part of the embodiments of the present application, but not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.

[0053] The "first", "second" and similar words mentioned in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Likewise, words like "a" or "one" do not denote a limitation in number, but indicate that there is at least one. Words such as "connected" or "connected" are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.

[0054] In the implementation of this application, "and / or" describes the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of complex geological pile foundation construction, and particularly discloses a pile forming construction method for a complex geological pile foundation. When the content of karst caves and cracks reaches 70% or above, the karst caves and the cracks are injected to be compact through karst grouting, and then pile foundation drilling is conducted; and when the content of the karst caves and the cracks of the pile foundation reaches 30% or below, pile foundation drilling is conducted through a follow-up steel casing. According to the pile forming construction method for the complex geological pile foundation, the influence of complex geology on pile foundation construction is effectively avoided, the construction quality is effectively improved, construction is conducted according to the different occupied amounts of the karst caves and the cracks in each pile foundation through different methods, and the construction cost is greatly reduced.

Description

technical field [0001] The invention relates to the technical field of pile foundation construction, in particular to a pile-forming construction method for pile foundations in complex geological conditions. Background technique [0002] The construction of pile foundation is carried out under the geological environment conditions of large-scale karst, fissures and beaded caves, and extremely rich groundwater. The difficulties of pile foundation hole formation, difficult quality control, and construction schedule are all important and difficult points of this project. The karst is widely distributed, the number of layers of karst caves is large, and the height of a single layer is large. During the construction process, there are the following possible situations: [0003] After drilling through the karst cave, the mud will be lost, and the mud level will drop rapidly, causing the hole to collapse, and may also cause the surface to collapse. This kind of problem is easy to o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/12E02D5/38E02D15/04
CPCE02D27/12E02D5/38E02D15/04
Inventor 郭相武赵志王智勇康健雷中平邓存俊冯健陈学江席利萍徐勇胡超杨侦龚斯昆赵代强
Owner CHINA RAILWAY NO 8 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products