Construction method for treating abnormal gas emission of goaf of low-gas mine through high-position drainage
A construction method and low gas technology, applied in gas discharge, wellbore/well valve device, production fluid, etc., can solve problems such as failure of timely and effective collapse of goaf roof, gas accumulation, etc., and achieve good governance effect, The effect of large amount of gas and high concentration of gas discharged
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0029] Such as figure 1 As shown, the construction method of high-level drainage to control the abnormal gas emission in the goaf of low-gas mine includes the following steps:
[0030] Step 1: Determine the height of the caving zone of the coal seam roof at the working face as 50.08m;
[0031] Step 2: Determine that the position of the final hole of the high-level drainage is not higher than 50m;
[0032] Step 3: Determine the slope of the upward trough to be 9°;
[0033] Step 4: The periodic pressure step of the working face is 30m;
[0034] Step 5: The initial collapse height of the roof is 12m after the working face is recovered and moved;
[0035] Step 6: Design at least 3 drill holes for each group;
[0036] Step 7: The distance between the final hole and the top plate of the working surface is set in sequence from bottom to top;
[0037] Step 8: The projected position of the final hole is arranged in a straight line from the bottom to the top of the working surface;...