The invention discloses a masonry-wall line-pipe, line-groove and line-box burying construction method. The construction method includes the steps that in the pre-construction method, reinforcing steel bars are pre-buried or post-implanted into a top plate and a bottom plate on the peripheries of a line pipe and a line groove buried in a masonry wall, the line pipe, the line groove and a line box are completely arranged, then the corresponding pre-buried reinforcing steel bars of the bottom plate and the top plate are bound and woven into a whole in a concrete-constructional-column mode, the line pipe, the line groove and the line box are fixed, a formwork is installed, and concrete pouring is carried out; in the post-construction method, reinforcing steel bars are pre-buried or post-implanted into a top plate and a bottom plate on the peripheries of a line pipe and a line groove buried in a masonry wall, the portion is reserved when wall masonry is carried out, and after masonry construction is completed, the line pipe, the line groove and a line box are installed, then the corresponding pre-buried reinforcing steel bars of the bottom plate and the top plate are bound and woven into a whole in a concrete-constructional-column mode, the line pipe, the line groove and the line box are fixed, a formwork is installed, and concrete pouring is carried out. According to the construction method, the wall does not need to be slotted, cracks or fractures of the wall can be avoided, environment pollution is reduced, labor strength is reduced, construction is simple, construction time is short, the cost is low, and the installing quality is reliable.