Power line remote wireless phase checking system and method based on 5G communication
A long-distance wireless and power line technology, applied in radio wave measurement system, satellite radio beacon positioning system, signal transmission system, etc., can solve problems such as large differences in induced voltage intensity, and achieve the effect of simple operation and guaranteed safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Embodiment 1: as figure 1 As shown, a remote wireless phase verification system for power lines based on 5G communication includes a reference host and a host to be tested. The reference host and the host to be tested are respectively connected to the line under test and the line to be tested through a signal collector. , the signal collector achieves data transmission with the receiving host through 5G, the reference host and the host to be tested are both connected to the Beidou ground-based augmentation system, and the reference host is connected to the host to be tested, such as image 3 and Figure 4 As shown, both the reference end host and the test end host include a microprocessor, a power supply module, a GPRS wireless module, an LCD display module, a GPS module, and a first radio frequency transceiver module, the first radio frequency transceiver module is wirelessly connected to the signal collector, and the GPS The module is wirelessly connected to the Beid...
Embodiment 2
[0028] Embodiment 2: a kind of verification phase method of the remote wireless phase verification system of power lines based on 5G communication, comprising the following steps:
[0029] S1. First, the signal collector on the line under test collects the signal collector on the line to be tested and the signal collector on the line to be tested respectively collects the voltage positive zero-crossing signal on the line under test and the voltage positive zero-crossing signal on the line under test, and then the signal collector Send the collected signal to the reference end host and the test end host through the second radio frequency transceiver module;
[0030] S2. The host at the reference end and the host at the test end start timing after receiving the second pulse signal sent by the GPS module, and end when receiving the positive zero-crossing signal of the voltage on the line under test and the line under test, and obtain the line under test and Time difference inform...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com