Stress relief pavement
A technology of stress relief and surface layer, which is applied in the field of stress relief pavement, can solve the problems of shortened service life of pavement, easily affected pavement, easy cracking of pavement, etc., and achieves the effect of avoiding cracking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] A stress relieved pavement such as image 3 and 4 As shown, the pavement body includes the concrete surface layer 1, the waterproof adhesive layer, the drainage stress absorption layer 3, the middle surface layer 4, the adhesive layer 5 and the upper layer 6 arranged sequentially from bottom to top.
[0031] The concrete surface layer 1 includes a concrete layer and a steel frame filled in the concrete layer. By setting the steel frame, the concrete layer can be attached to the steel frame, so that the structural strength of the concrete surface layer 1 is effectively strengthened, so that the steel frame can support the concrete. The stress of the layer is resisted to avoid the problem that the concrete layer is more prone to cracking.
[0032] The waterproof adhesive layer includes several wide anti-crack stickers bonded on the top surface of the concrete layer, glass fiber grid 2 laid on the top surface of the wide anti-crack sticker, and asphalt covered on the wide...
Embodiment 2
[0044] The difference from Example 1 is:
[0045] High-performance asphalt mastic-coated skeleton particles include 84 parts of 3-5mm aggregate, 16 parts of 0-3mm aggregate, 4 parts of mineral powder and 6 parts of high-viscosity asphalt.
[0046] Test items unit Test results skills requirement Individual judgment bitumen content % 7 —— —— Oil-stone ratio % 6.54 —— —— Martens relative density / 2.3522 measured value —— stability KN 4.86 ≥5.0 qualified flow value 0.1mm 30 20~40 qualified porosity % 16.7 15~23 qualified Mineral Gap Ratio % 32.4 —— —— bitumen saturation % 43 —— —— Kentucky Scatter % 16.6 ≤20 qualified Schellenberg Bitumen Leakage % 0.21 ≤0.3 qualified Rutting test times / mm 4016 ≥4000 qualified
[0047] Table 1 is the test result of the asphalt mixture index in Example 1
[0048] Test items unit Test results skills requ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


