Existing building reconstruction engineering hybrid simulation system based on three-dimensional monitoring and BIM

A hybrid simulation technology for existing buildings, applied in traffic control systems, road vehicle traffic control systems, 3D modeling, etc., can solve the problems of difficult supervision, low efficiency, and large monitoring data, so as to ensure safe and reasonable operation, The effect of improving the degree of transparency and reducing the difficulty of supervision

Pending Publication Date: 2021-07-13
TONGJI UNIV +1
View PDF9 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the high mobility of people and goods in the subway station, there are many corresponding monitoring data. During non-stop renovation, monitoring personnel cannot quickly and accurately determine the management and control strategy for the renovation process based on a large amount of monitoring data, which is not conducive to Carrying out transformation control work
[0004] To sum up, the existing monitoring system has difficulties in supervision and lack of an integrated monitoring and simulation framework for building renovation projects under non-stop operation, which leads to inaccurate construction and low efficiency during non-stop construction, and cannot guarantee the safety of construction run reasonably

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Existing building reconstruction engineering hybrid simulation system based on three-dimensional monitoring and BIM
  • Existing building reconstruction engineering hybrid simulation system based on three-dimensional monitoring and BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] Such as figure 1 with figure 2 As shown, a hybrid simulation system for existing building renovation projects based on 3D monitoring and BIM includes a central processing unit 1, a BIM model processing unit 2 and a linkage acquisition control unit 3. The central processing unit 1 is connected with the BIM model processing unit 2 and the The linkage acquisition control unit 3 is connected by communication, the linkage acquisition control unit 3 is used to obtain the three-dimensional monitoring information, the central processing unit 1 is used to acquire the three-dimensional monitoring information of the linkage acquisition control unit 3 and send it to the BIM model processing unit 2, the linkage acquisition control unit 3 Including RFID component 31, alarm component 32, power supply component 33, video acquisition component 34, processing component 35, communication component 36 and traffic acquisition component 37, wherein the three-dimensional monitoring informati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an existing building reconstruction engineering hybrid simulation system based on three-dimensional monitoring and BIM. The existing building reconstruction engineering hybrid simulation system comprises a central processing unit, a BIM model processing unit and a linkage acquisition control unit, and the central processing unit is in communication connection with the BIM model processing unit and the linkage acquisition control unit; and the linkage acquisition control unit is used for obtaining three-dimensional monitoring information, and the central processing unit is used for obtaining the three-dimensional monitoring information of the linkage acquisition control unit and sending the three-dimensional monitoring information to the BIM model processing unit. The linkage acquisition control unit comprises an RFID assembly, an alarm assembly, a power supply assembly, a video acquisition assembly, a processing assembly, a communication assembly and a flow acquisition assembly. Compared with the prior art, the system has the advantages of improving the working efficiency, reducing the supervision difficulty and the like.

Description

technical field [0001] The invention relates to the construction field of existing building renovation projects, in particular to a hybrid simulation system for existing building renovation projects based on three-dimensional monitoring and BIM. Background technique [0002] Building Information Modeling (BIM, Building Information Modeling) is based on the relevant information data of construction projects, simulates the real information of buildings through digital information simulation, and realizes engineering supervision, property management, and equipment management through three-dimensional building models. Management, digital processing, engineering management and other functions. BIM has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and drawing, and is widely used in the field of architectural design. Through BIM, you can intuitively and detailedly understand ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/20G06K17/00G06T17/00G08B13/196G08G1/065G06Q50/08
CPCG06F30/13G06F30/20G06T17/00G06K17/00G08B13/196G08G1/065G06Q50/08
Inventor 赵昕叶旭峰
Owner TONGJI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products