Preparation process of high-strength and high-toughness 316LF stainless steel
A preparation process and technology of stainless steel, which is applied in the field of preparation technology of high-strength and high-toughness 316LF stainless steel, can solve the problems of increasing the cost of input, material clogging of hoppers, affecting processing efficiency, etc. The effect of improving processing efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] The invention provides a technical solution: a preparation process of high-strength and high-toughness 316LF stainless steel. The preparation process of the 316LF stainless steel includes the following preparation steps: electric arc furnace plus intermediate frequency furnace-AOD furnace-continuous casting-rolling bar-inspection- wrap up and store;
[0032] Among them, the inspection includes the following procedures: surface and size inspection - ultrasonic inspection;
[0033] Electric arc furnace plus intermediate frequency furnace process, metal iron is placed in the electric arc furnace 1, the temperature in the furnace is 1600-1800 ℃, after melting, the blast furnace molten iron is obtained, and the alloy is put into the intermediate frequency furnace, and the temperature in the furnace is 1600-1750 ℃ , to obtain alloy solution;
[0034] In the AOD furnace process, the blast furnace molten iron and alloy solution are injected into the AOD furnace through the lad...
Embodiment 2
[0041] see figure 1 and figure 2, in this embodiment, the top surface of the electric arc furnace 1 is fixedly connected with a fixed plate 2, the top side wall of the fixed plate 2 is fixed with a guide column 3, and the other end of the guide column 3 is fixedly connected with the top surface of the electric arc furnace 1, and The side wall of the guide column 3 is slidingly sleeved with a guide sleeve 4, and an electric push rod-5 is installed on the top surface of the guide sleeve 4, and the other end of the electric push rod-5 is affixed to the inner top surface of the fixed plate 2, and A connecting block 6 is fixedly connected to the side wall of the guide sleeve 4, and a spring 7 is installed on the bottom surface of the connecting block 6. There are two plates 2 and two guide sleeves 4 respectively, the two fixed plates 2 and the guide sleeves 4 are arranged symmetrically with respect to the hopper 10, and the cross section of the connecting block 6 is arranged in a...