Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of reservoir dispatching rule base with expansibility and structuralization

A construction method and structured technology, applied in the direction of instruments, data processing applications, resources, etc., can solve the problem of not yet organized and structured the reservoir dispatch scheme, yet to achieve the mathematical representation and expression of the single reservoir or multi-reservoir joint dispatch scheme, and inability to Objectively reflect problems such as easy machine analysis and generation, easy to read and write, and achieve the effect of digital description and construction

Pending Publication Date: 2021-09-17
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Traditional reservoir dispatching models, existing watershed management decision-making support systems, etc., have not realized the mathematical representation and expression of single-reservoir or multi-reservoir joint dispatching schemes, and cannot objectively reflect and integrate reservoir dispatching knowledge and technology, expert experience and conventional cognition However, the orderly organization and structure of the reservoir dispatching plan with narrative text as the main expression form has not yet been realized, and it is impossible to fully reflect the dispatching elements (dispatching objects, control stations, flood control protection objects and related hydrological The causal relationship and organic link between elements)

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of reservoir dispatching rule base with expansibility and structuralization
  • Construction method of reservoir dispatching rule base with expansibility and structuralization
  • Construction method of reservoir dispatching rule base with expansibility and structuralization

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0026] The present invention will now be described in detail by taking the construction of the dispatching rule base of a certain flood control reservoir as an example, and it will also serve as a guide for the construction of the dispatching rule base of other water resources and ecological reservoirs.

[0027] The construction method of certain flood control reservoir a dispatching rule base described in the present embodiment comprises the following steps:

[0028] Step (1): Extraction of eigenvalues ​​of reservoir dispatching rules, as shown in Table 1, it can be seen that the start-up timing and dispatching methods of reservoir a are different, only the relevant eigenvalues ​​need to be analyzed and extracted, and it can be summarized as a unified Manifestations;

[0029] Table 1 Reservoir a dispatching rule eigenvalue extraction table

[0030]

[0031] The reservoir flood control dispatching rule described in this embodiment has multiple types of characteristic value...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a reservoir dispatching rule base with expansibility and structuralization. The method comprises the following steps: 1, extracting characteristic values of a reservoir scheduling rule, including elements such as a control object, a starting opportunity, a scheduling mode, a corresponding reference site, a reference condition and the like; 2, carrying out prototype design on the scheduling rule base according to a logic relation between the characteristic values; 3, based on the selected network data exchange format with expansibility and structuralization, constructing a reservoir scheduling rule base system framework; and 4, carrying out numerical instantiation on the scheduling rule base by using the extracted reservoir scheduling rule characteristic value, and providing data support for model calling. Digital description and construction of the reservoir group joint scheduling rule are achieved, the method has the advantages of being universal, practical, easy to expand and the like, workers can read and compile the rule easily, meanwhile, machine analysis and generation are easy, the method conforms to the operation mode of actual scheduling, and the expansibility and applicability of the reservoir scheduling rule are improved.

Description

technical field [0001] The invention relates to the cross technical field of water conservancy and hydropower and computer science, more specifically, it is a method for constructing a reservoir dispatching rule base with scalability and structure. This method can realize the generalized description of reservoir operation alone or cascade (series, parallel) joint operation rules, and can be used for rapid development and extended application of reservoir dispatching models and watershed management business models (such as flood control, power generation, ecology, shipping, etc.) Provide a feasible path. Background technique [0002] There are many river basin and reservoir projects in our country. Using advanced information technology to implement joint intelligent dispatch of river basin and reservoir groups under the framework of unified dispatching technology is an important means to make up for the shortcomings of flood control and disaster reduction and water resource u...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/0631G06Q50/06
Inventor 喻杉黄艳李安强王学敏罗斌
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More