A support technology for underground structures and foundation pits, which is applied in foundation structure engineering, underwater structures, excavation, etc., can solve the problems of waste of support piles, large material input, and short functioning time, so as to simplify the construction process, The effect of reducing construction costs and shortening the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] This embodiment provides an underground structural system having a foundation pit support function, such as figure 1 with figure 2 As shown, including at least two layers of body units disposed from the outer to withinward; the main body unit includes several intervals distributed body piles 1, and adjacent two main body pile 1 of each body unit is connected to form a closed beam 3. structure.
[0044] Among them, the main body pile 1 is designed according to the standard structure of the main structure, that is, the main load of its assumption is the vertical load transmitted in the upper structure, and the support pile in the general engineering, whether it is temporary or permanent support pile, mainly Function is a soil load in the horizontal direction, so that the main body pile 1 in the design, construction and use of the present embodiment is completely different from the general support pile. The main body pile 1 of the outermost body unit can assume the horizontal ...
Embodiment 2
[0055] This embodiment provides a construction method of an underground structural system having a foundation pit support function, including the following steps:
[0056] Step 1: Construction of the main body pile 1 along the position of the field boundary and the peripheral frame column to form an outer body unit.
[0057] Among them, the main pile 1 is designed in advance; the traditional support pile mainly undertakes the soil load in the horizontal direction. Since the construction space (branch template) required, the general frame column must be in the foundation pit excavation Can be used for construction. This embodiment uses a pile column integral technology (ie, as a frame column as a frame post), the construction of the column before excavation of the pile is used.
[0058] Further, steel bars inside the main body pile 1 need to reserve a joint for connecting the support beam, or a pre-buried steel member for the connection. The arrangement of the main body pile 1 must...