Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

lightweight BIM prefabricated part full life cycle comprehensive information management system

A full-life cycle, prefabricated component technology, applied in design optimization/simulation, special data processing applications, geometric CAD, etc., can solve the problems of low degree of mechanization and informatization, difficult to guarantee safety, slow progress, etc., to improve comprehensive information Management level, reduce the probability of errors and rework, reduce the effect of memory consumption

Pending Publication Date: 2021-11-30
CHINA RAILWAYS CORPORATION +2
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, my country's tunnel construction has made great progress, but the current railway tunnel construction is mainly based on the drilling and blasting method, which has many construction steps, untimely support and closure, difficult guarantee of safety, difficult quality control, slow progress and work efficiency. The disadvantages are relatively low, and the degree of mechanization and informatization is low, and there is a big gap between the tunnel construction technology of developed countries such as Europe and the United States.
However, the existing production methods of tunnel prefabricated components are relatively backward, and the information management level of the entire industrial chain of prefabricated buildings is relatively low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • lightweight BIM prefabricated part full life cycle comprehensive information management system
  • lightweight BIM prefabricated part full life cycle comprehensive information management system
  • lightweight BIM prefabricated part full life cycle comprehensive information management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0043] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "another end" The orientation or positional relationship indicated by etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, use a specific Azimuth configuration and operation, therefore, should not be construed as limiting the invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and should not be understood ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a lightweight BIM prefabricated part full life cycle comprehensive information management system. The system comprises a lightweight BIM management module, a lightweight BIM processing module, a lightweight BIM data management module, a lightweight BIM construction progress dynamic management module and a lightweight BIM monitoring measurement module. Based on the advantages of visualization, digitization, multi-dimension, coordination, whole-process simulation and the like of the BIM technology, geometric information, functional attributes and process information of engineering objects are completely expressed, reproduced, transmitted and shared, co-governance, co-management and coordination of all participants of a construction project on the same target object and a single engineering data source can be supported. A sharing platform is provided for design construction, resource allocation, construction simulation and monitoring measurement; according to the system, the running speed of a processing computer can be increased, memory consumption is reduced, the response speed is high, and the error and rework probability caused by participation of multiple units can be reduced.

Description

technical field [0001] The invention relates to the field of prefabricated component buildings, in particular to a lightweight BIM prefabricated component full life cycle comprehensive information management system. Background technique [0002] With the higher requirements for quality, safety and efficiency of modern tunnels, the development mode of tunnel construction equipment in my country is relatively extensive, which has become a bottleneck restricting the progress of tunnel construction technology. [0003] At present, my country's tunnel construction has made great progress, but the current railway tunnel construction is mainly based on the drilling and blasting method, which has many construction steps, untimely support and closure, difficult guarantee of safety, difficult quality control, slow progress and work efficiency. The disadvantages are relatively low, etc., the degree of mechanization and informatization is low, and there is a big gap in tunnel constructio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13G06F30/12G06F30/20
CPCG06F30/13G06F30/20G06F30/12
Inventor 王志伟马伟斌郭小雄王子洪费建波
Owner CHINA RAILWAYS CORPORATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products