Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

67results about How to "Scheduling is simple" patented technology

System and method for positioning underground personnel

The invention discloses a system and a method for positioning underground personnel in a coal mine. The system comprises a ground monitoring center arranged aboveground, a transmission base state arranged underground, a plurality of gateway nodes, an optical fiber, a bus, a plurality of wireless beacon nodes and a plurality of mobile nodes, wherein the system is intrinsically safe when applied to underground equipment. The method is a positioning method based on mode matching and comprises the steps of: dividing a roadway into different blocks according to a roadway structure and the signal coverage area of the beacon nodes, distributing the beacon nodes in each block according to a same manner, generating a positioning mode database on the ground monitoring center through training the nodes in a training state, sending a positioning mode to the ground monitoring center by the mobile nodes according to the positioning signals of the received beacon nodes in a positioning stage, matching a mode generated by training the nodes in the database to find out a proximate mode, thereby realizing accurate positioning. The system and the method for positioning the underground personnel are high imprecision, low in cost and low in energy consumption, and the system is simple in equipment structure.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Submerged-arc furnace controller with low-pressure reactive compensation and electrode current control

The invention relates to a submerged-arc furnace controller with low-pressure reactive compensation and electrode current control. The controller with low-pressure reactive compensation and electrode current control comprises controller hardware and control software, wherein the control software is used for controlling and manipulating the controller hardware; the controller hardware comprises a current transformer (1), a voltage transformer (2), a high-precision three-phase special electric-energy metering chip (3), an ARM (Advanced RISC Machines) microcontroller (4), a power factor control output segregation interface (5), a current control output segregation interface (6), an abnormal event input segregation interface (7), an analog-quantity input interface (8), a keyboard, an LED (Light Emitting Diode) indicating lamp (9), an LCD (Liquid Crystal Display) (10) and a communication interface (11); and the control software refers to the control over all phases of current and all phases of power factors. According to the controller provided by the invention, low-pressure compensation is carried out on a three-phase power supply of a submerged-arc furnace through phase splitting, and electrode current is controlled to run in a balanced way at the value close to the optimum value, so that the purposes of increasing all phases of power factors, saving energy and improving efficiency are achieved.
Owner:QINGHAI HUABO TECH

Tidal bore process simulation device based on frequency control of multiple water pumps

The invention relates to a tidal bore process simulation device based on frequency control of multiple water pumps. The tidal bore process simulation device based on frequency control of multiple water pumps aims at achieving the purpose that the high energy-storage tidal bore head can be generated, the advancing speed and height of the tidal bore in the transmission process, and thus the tide flooding and ebbing process of the whole tidal can be simulated. According to the technical scheme, the tidal bore process simulation device based on frequency control of the multiple water pumps comprises an upstream water supply pool, an upstream water storage pool, a downstream water supply pool, a downstream water storage pool located under the downstream water supply pool and an experiment water tank, wherein the two ends of the experiment water tank communicate with the upstream water supply pool and the downstream water supply pool correspondingly; and the tidal bore process simulation device further comprises an arc-shaped valve arranged on the upper portion of the upstream water storage pool, multiple water pumps arranged in the upstream water storage pool and the downstream water storage pool, at least two layers of energy dissipation plates arranged between a water flowing passageway arranged between the upstream water supply pool and the upstream water storage pool and at least two layers of energy dissipation plates arranged in a water flowing passageway arranged between the downstream water supply pool and the downstream water storage pool.
Owner:ZHEJIANG INST OF HYDRAULICS & ESTUARY

Method, device and system for selecting access carrier frequency

The implementation of the invention discloses a method, device and system for selecting access carrier frequency. The method for selecting access carrier frequency includes the steps of acquiring version information of access terminal and selecting carrier frequency corresponding to the version information of access terminal as the access frequency of the access terminal according to preset correspondence of the version information of terminal and carrier frequency superiority. The system for selecting access carrier frequency comprises a network side device and an access terminal; the network side device is used for acquiring the version information of the access terminal; carrier frequency corresponding to the version information of the access terminal is selected according to preset correspondence of the version information of terminal and carrier frequency superiority; and the access terminal is used for accessing the carrier frequency assigned by the network side device according to an assignment message sent by the network side device. The technical scheme can avoid that terminals in different versions are coexisted in the same access carrier frequency, thus improving throughout of carrier frequency and improving experience of terminal user.
Owner:SHANGHAI HUAWEI TECH CO LTD

Coordinated control method of track and crane for handling system of semiconductor production line

The invention relates to a semiconductor production line handling system oriented track and crown block coordination control method. A crown block is provided with a signal transceiver, and a track connected with each branch of a turnout is provided with light transmitting / receiving devices; a programmable logic controller acquires signals of the light transmitting / receiving devices according to a light communication controller so as to control the running of a crown block. The semiconductor production line handling system oriented track and crown block coordination control method comprises the following steps: a server determines key points needing passing in a path according to the planned running path of the crown block, downloads the key point information of the path to the crown block, and monitors the running position and the running state of the crown block in the track according to the state of a forked track. According to the method, light communication devices are installed on the track before entering the turnout and the crown block, and are matched with the programmable logic controller, so that before the crown block enters the turnout, the conversion of the track is completed, and further, the crown block in running in the track is relatively safe and reliable; due to the use of a temporary storage region of the crown block, possible jam caused by multi-crown block scheduling can be prevented, and the automation of the handling system is improved greatly.
Owner:SHENYANG INST OF AUTOMATION - CHINESE ACAD OF SCI

User equipment and detection method and device for physical downlink control channel of user equipment

The invention discloses user equipment and a detection method and a device for a physical downlink control channel of the user equipment. The method comprises the following steps: determining configuration of an aggregation level combination or a PDCCH candidate combination; determining the aggregation level combination or the PDCCH candidate combination according to the configuration of the aggregation level combination or the PDCCH candidate combination, and taking the aggregation level or the PDCCH candidate in the aggregation level combination or the PDCCH candidate combination as a memberaggregation level or a member PDCCH candidate; and performing blind detection on the PDCCH candidate corresponding to the aggregation level combination or the PDCCH candidate combination according tothe configuration of the aggregation level combination or the PDCCH candidate combination. According to the invention, on one hand, the robustness of the PDCCH is improved, and on the other hand, toolarge continuous resources corresponding to the PDCCH with a certain high aggregation level do not occur, so that the conflict between the improvement of the robustness of the PDCCH and the avoidanceof the blockage of PDCCH resources allocated by the network is eliminated, and the two aspects can be well considered.
Owner:SPREADTRUM COMM (SHANGHAI) CO LTD

A dispatching method of a combined heat and power system for improving wind power consumption by comprehensive heat supply of buildings

The invention relates to a dispatching method of a combined heat and power system for improving wind power consumption by comprehensive heat supply of buildings, which comprises the following steps ofpredicting wind power increment in a next time period; if the power increment of wind power is positive, decreasing the output of thermoelectric generating units in order; if the output of the thermoelectric generating units can be reduced, reducing the output of the thermal power and the electric power of the co-generating units in sequence; if the wind power increment is negative, increasing the thermal power and electric power output of the cogeneration unit in sequence; if there is no co-generation unit output can be increased, increasing the output of the sub-generation unit sequentially; calculating the heating electric power and heating thermal power of each building in the next period, and the power distribution of the whole electric heating combined system; checking for power overruns. The technical scheme of the invention is applicable to the comprehensive dispatch of the electric heating combined system in the winter heating period in the area with abundant wind power and severe cold temperature, combines the central heating of heat power and the decentralized heating of electric power, utilizes the heat inertia of the heating pipe network and the building, increases the overall flexibility and the peak-shaving space of the electric heating combined system, and contributes to the improvement of the consumption of the wind power.
Owner:FUXIN POWER SUPPLY COMPANY STATE GRID LIAONING ELECTRIC POWER +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products