Pile constructing process including drilling hole with long screw and pressure depositing concrete and steel bar cage vibrating feeder
A construction technology and concrete pouring technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems such as the failure of the sinking steel cage work, the inability to guarantee the quality of the pile, the bending deformation, etc., to meet the seismic design requirements. requirements, strengthen the compactness, the effect of high bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] Below in conjunction with specific embodiment the present invention is described in further detail:
[0010] The steel cage vibrating cage feeder shown in the figure has a high-frequency vibration motor 2, which is the vibration source of the cage feeder, and the power is about 3~6KW, which can be obtained by purchasing prior art products. This high-frequency vibration motor 2 is fixed on the motor mounting plate 4 by motor mounting bolts 3, and the top of the high-frequency vibration motor 2 has a lifting ring 1 for lifting the whole cage feeder and the reinforcement cage 14 thereon. The both sides of motor mounting plate 4 are provided with traction rope ring 6, are used for fastening righting rope, guarantee the verticality that cage feeder and reinforcement cage are laid by people's manipulation righting rope. A vibration ring 7 is welded below the motor mounting plate 4, and a vibration platform 8 is arranged below the vibration ring 7. The vibration platform 8 can...