Method for replacing open pit bottom sludge by alternately extruding waste rocks in different areas
A technology of stone partitioning and silt is applied in the field of using waste rock partitions to alternately extrude and replace silt at the bottom of open pit pits. Strong stability, reducing stockpiling, and beneficial to environmental protection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] An open-pit copper mine is facing a closed pit and backfilling. Due to natural rainfall and drainage from the upper steps, a large amount of silt is deposited at the bottom of the pit, and the average thickness of the mud layer is 4.5m. A method for replacing open-pit bottom silt by alternate extrusion of waste rock partitions, the specific method is as follows:
[0039] First, if figure 1 As shown, the mud 1 at the bottom of the open pit is divided into horizontal blocks, that is, the waste rock 2 is transported to the bottom of the open pit by the transport ramp in the pit using mining trucks, and the waste rock is filled from the middle of the pit bottom plane until the filled waste rock 2 The silt plane is exposed and vibrated and compacted to form a strip-shaped waste rock segment, and the entire silt backfill area is divided into A and B areas. Subsequently, the two districts A and B were subdivided in the same way, and finally the waste rocks were used to squeez...
Embodiment 2
[0046] A method for alternately extruding and replacing open-pit bottom sludge by using waste rock in partitions is mainly suitable for open-pit mines to alternately squeeze and replace open-pit bottom sludge in the manner of "horizontal block and vertical partition" by using mine waste rock.
[0047] The horizontal division is to use waste rocks to divide the mud at the bottom of the open pit into strips in the horizontal direction, divide it into pieces several times in the middle, and then break it into pieces, and then squeeze out the silt and replace it piece by piece.
[0048] The vertical division, that is, divide the silt pit divided into blocks into two parts, the waste rock filling area and the passive extrusion area, every time it is filled in the vertical direction. Among them, the waste rock filling area is bounded by the outer edge of each backfill waste rock, and the remaining part in the silt pit is a passive extrusion area.
[0049] Step 1: Throw and fill a larg...