Periodic test device and method for instrument control system of nuclear power plant, medium and electronic equipment
An instrument control system and periodic test technology, applied in the field of nuclear power, can solve the problems of test signal input, frequent plugging and unplugging of wiring terminals, etc., and achieve the effect of improving test efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] This implementation provides a periodic test device for the instrument and control system of a nuclear power plant, including a terminal unit, a test unit and a maintenance unit.
[0066] The terminal unit is installed on the instrument control system, and is electrically connected with the circuit inside the instrument control system, so as to realize the purpose of signal input, and the input signal includes actual signal and test signal.
[0067] The signal output terminal of the test unit is electrically connected to the terminal unit, and the test signal is output through the test unit, and finally input into the instrument control system through the terminal unit.
[0068]The signal input terminal of the maintenance unit is electrically connected with the maintenance signal output terminal of the instrument control system, the signal output terminal of the maintenance unit is electrically connected with the signal input terminal of the test unit, and the maintenanc...
Embodiment 2
[0077] The actual signal terminal 3 is a normally connected structure, which can be connected by a practical terminal at the present stage. This embodiment provides the structure of the test signal terminal 2. The test signal terminal 2 includes a terminal body and a test signal paddle.
[0078] The terminal body is fixedly arranged on the printed board 1, and is electrically connected to the signal input end of the instrument control system. The terminal body is provided with a plurality of signal jacks, and the connection between the terminal body and the instrument control system is controlled by the first embodiment above. It can be controlled by the controller, and you can choose whether to connect to the instrument control system according to your needs.
[0079] The test signal pick is adapted to the signal jack, and when the regular test is not carried out, the test signal pick is set in the signal jack. The main function of the test signal pick is to block the signal j...
Embodiment 3
[0084] This embodiment illustrates the structure of the test unit, which includes a host computer, a signal source and a test signal connector.
[0085] The signal input end of the upper computer is electrically connected with the signal output end of the maintenance unit, and the upper computer is a movable stand-alone
[0086] The control terminal of the signal source is electrically connected to the control terminal of the host computer. The signal source includes analog signal source and digital signal source. The types of analog signal source include mA active, mA passive, TC-K type, TC-N type, PT100 , pulsed square wave, digital source types include dry node and wet node.
[0087] The output end of the signal source is electrically connected to the test signal connector. The test signal connector is provided with a signal pin that is compatible with the signal jack. The signal from the signal source is injected into the instrument control system through the test signal c...