House building method based on BIM (Building Information Modeling) preset model

A technology of preset models and models, applied in special data processing applications, geometric CAD, etc., can solve the problems of difficult construction, small basement space, and delayed construction period.

Pending Publication Date: 2022-03-29
KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] When the traditional construction industry builds some large buildings such as hospitals, it needs to install more equipment such as water supply, HVAC, electrical, fire-fighting and other pipelines, as well as various civil engineering and electromechanical equipment installations, and in inpatient buildings, medical technology buildings, The main structure such as the outpatient building is gradually being completed, and when equipment needs to be installed, it is discovered that due to the small space in the basement, there are various comprehensive pipelines in the hospital, which makes the construction difficult
[0003] In addition, during the construction process, the drawings need to be replaced at any time according to the actual size of the site. For the existing CAD drawing method, a small data change may replace many drawings, which brings great inconvenience to the construction unit. At the same time, the construction period was delayed; the construction distance, maintenance space, and net height of various pipelines and equipment must meet the requirements of on-site construction. There is no preset model in the existing technology, which can only be solved in time when encountering situations, and cannot solve such problems Avoidance prevention, so there is an urgent need for a house construction method that can preset models and improve installation quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • House building method based on BIM (Building Information Modeling) preset model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0019] Example 1: See figure 1 , a method for building a house based on a BIM preset model in this embodiment includes the following steps: S1: Establish a civil engineering BIM model of the housing, and build the overall structure according to the civil engineering BIM model of the housing; The error is controlled within the tolerance range; the actual structural size whose structural error is not within the tolerance range is imported into the building civil engineering BIM model in S1; S3: review and correct the housing civil engineering BIM model according to the actual structural size; S4: establish the mechanical and electrical BIM separately model, and conduct a separate inspection of the BIM electromechanical model; the electromechanical model includes the pipeline model and the equipment model; S5: Integrate the electromechanical BIM model and the building civil BIM model in S3, and conduct collision inspection; S6: If there is a collision point, according to the colli...

Embodiment 2

[0020] Embodiment 2: This embodiment also includes identifying and distinguishing civil engineering BIM models and electromechanical BIM models according to component families to form a filter system. It is convenient for others to understand the drawings and reduces the difficulty of processing technology. In step S5 of this embodiment, the distance between the strong current bridge and the weak current bridge frame is not less than 0.3m, and the distance between the pipelines is not less than 0.1m. In this embodiment, before step S8, it also includes establishing a BIM model of the support and hanger, and pre-installing the support and hanger before installing the pipeline, and the support and hanger is used to fix the pipeline to the beam. It can optimize the pipeline layout route, calculate the optimal support and hanger arrangement in advance, and make arrangements in advance at the positions where support and hangers need to be installed. In this embodiment, the load-be...

Embodiment 3

[0021]Embodiment 3: The drawing colors of various pipes in this embodiment are different, and different pipes are distinguished by color. In the actual construction process, a color printer is also required to print construction drawings, which is convenient for construction personnel to carry out accurate construction. In step S8 of this embodiment, the installation position of the pipeline in the BIM model is corrected according to the actual construction situation, and the correction interval is ±5cm. Since the on-site construction cannot be exactly the same as the geometric dimensions given in the drawings, after construction, it is necessary to re-measure and import the actual dimensions into the BIM model for collision detection again. In this embodiment, in step S4, in the process of establishing the pipeline model, spaces for turning and tees are reserved for the pipeline branch pipes. The pipeline layout is intricate. According to the BIM model, you can know in advan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a house building method based on a BIM (Building Information Modeling) preset model, which can preset a house model in advance, grasp the position of electromechanical equipment, perform structural design and position optimization in advance, find problem points in advance and reduce the subsequent rework cost, and the unified BIM model can consider the size of each detail position, so that the construction efficiency is improved. And the deviation of the whole project is reduced.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a method for building a building based on a BIM preset model. Background technique [0002] When the traditional construction industry builds some large buildings such as hospitals, it needs to install more equipment such as water supply, HVAC, electrical, fire-fighting and other pipelines, as well as various civil engineering and electromechanical equipment installations, and in inpatient buildings, medical technology buildings, The main structure such as the outpatient building is gradually being completed, and when it is necessary to install equipment, it is discovered that due to the small space in the basement and the existence of various comprehensive pipelines in the hospital, it is difficult to construct. [0003] In addition, during the construction process, the drawings need to be replaced at any time according to the actual size of the site. For the existing CAD dr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13
CPCG06F30/13
Inventor 朱伯东许永魏焰艾涛徐丹朱未平赵军何群秀梁晓红刘薇薛连李敏
Owner KUNMING RAILWAY CONSTR COMPANY OF CHINA RAILWAY NO 8 ENG GRP