A feng shui and coal seam technology, applied in drilling equipment and methods, earthwork drilling, gas discharge, etc., can solve problems such as insignificant anti-penetration effect, substandard gas drainage, and prolonged construction time, etc., and achieves wide practicability, The method is simple, reducing the effect of plugging and sticking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention is further described below in conjunction with the composite coal seam punching example in the accompanying drawings:
[0025] like figure 1 As shown, the composite coal seam air-water conversion method for reaming, pressure relief and anti-reflection of the present invention includes the use of high-pressure water pumps, air compressors and drill pipes, and the steps of the anti-reflection method are as follows:
[0026] a. Construct the through-bed drilling from the bottom pumping roadway to the roof of the coal seam at 0.5m, make sure to pass through the coal seam, and drill back 0.5m; at this time, the drill bit is in the structural coal body 2;
[0027] b. Connect the high-pressure water pump 11, the air compressor 12 and the drill pipe 7 together with the high-pressure rubber hose 14 and the wind-water converter 6, close the water inlet 15 and the air inlet 16 of the wind-water converter 6, start the air compressor 12 and adjust to the set p...