Supercharge Your Innovation With Domain-Expert AI Agents!

Main and distribution network intelligent linkage system and fault full-stop full-transfer implementation method

An intelligent linkage and failure technology, applied in the direction of AC network circuit, AC network voltage adjustment, electrical components, etc., can solve the time-consuming and labor-intensive problems of main network failure recovery, improve power supply reliability, shorten power outage time, and realize fast linkage Effect

Pending Publication Date: 2022-06-21
STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the time-consuming and labor-intensive problem of main network fault recovery in the prior art, the present invention provides a main distribution network intelligent linkage system and a fault full stop and full transfer realization method, which are used to realize the full stop of substations caused by main network faults, or substations When the medium 10kV bus loses power and the standby automatic switching fails, it can intelligently identify the fault type, calculate the load to be transferred in real time, and combine the switching channel limit to accurately perform load switching and switching in the entire network, reducing the fault recovery time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main and distribution network intelligent linkage system and fault full-stop full-transfer implementation method
  • Main and distribution network intelligent linkage system and fault full-stop full-transfer implementation method
  • Main and distribution network intelligent linkage system and fault full-stop full-transfer implementation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0032] In this embodiment, the system needs to collect the following information from the substation:

[0033] Remote measurement: remote measurement of the main transformer low-voltage side, 10kV bus breaker, each outgoing line under the 10kV busbar and the opposite side line, such as current and active power; remote measurement of the voltage of the 10kV busbar.

[0034] And judge four aspects: 1) "Intelligent linkage of main distribution network" is available. 2) "Intelligent linkage of main distribution network" is locked. 3) 10kV bus loses voltage. 4) 10kV bus failure.

[0035] 1) "Smart linkage of main distribution network" is available: the charging conditions of the above-mentioned devices are the same.

[0036] 2) Lockout of "intelligent linkage of main distribution network": the same as the discharge condition of the above-mentioned device.

[0037] 3) 10kV busbar voltage loss: "main distribution network intelligent linkage" is available; 10kV busbar I busbar has...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a main distribution network intelligent linkage system and a fault full-stop full-rotation realization method, and the system comprises an intelligent linkage device which is connected with a bus and is used for collecting a bus signal, carrying out the charging and discharging operation, and judging whether the bus has a fault or not; and the scheduling module is connected with the intelligent linkage device and is used for executing load transfer and / or reverse delivery operation according to the data provided by the intelligent linkage device. The method is used for intelligently identifying the fault type, calculating the load capacity to be transferred in real time and accurately switching and transferring loads in the whole network range in combination with the transfer channel limit when the transformer substation is fully stopped due to the main network fault or the 10kV bus in the transformer substation loses power and the spare power automatic switching failure occurs, and the fault recovery time is shortened.

Description

technical field [0001] The invention relates to the field of power grid fault processing, in particular to an intelligent linkage system of a main distribution network and a method for realizing full stop and full rotation due to faults. Background technique [0002] With the rapid development of local economy and urban and rural construction, the risk of power grid is increasing day by day, and the number of six-level risk warning orders of power grid throughout the year has increased significantly. The measures taken by traditional substations to prevent total shutdown of the power grid risk often adopt strengthened equipment inspections, and the technical measures on the 10 kV side stay in the use of backup and automatic switching in the station. The load restores the 10 kV bus voltage, and the emergency treatment usually takes a long time. The reasons for the existing technology deficiencies, combined with the current processing methods, when the on-duty monitor finds a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00H02J3/14
CPCH02J3/00125H02J3/0073H02J3/144
Inventor 沈健杨晓丰陈根奇俞小虎王少春姚皇甫李勇张心心杨炀孙伟刚李成标李刚李孝蕾杜旭李爽何璐
Owner STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More