Construction method for avoiding deviation of shear wall column of residential engineering main body
A construction method and shear wall technology, applied in the connection of formwork/formwork/work frame, the treatment of formwork, the treatment of building materials, etc., can solve the problem of increased maintenance operations, increased construction costs, waste of steel materials, etc. question
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] In order to fully understand the purpose, features and effects of the present invention, the present invention will be described in detail by the following specific embodiments, but the present invention is not limited thereto.
[0021] see Figure 1 to Figure 4 , the present invention provides a construction method for avoiding the displacement of the main shear wall column of a residential project, which is carried out according to the following steps:
[0022] S1. After the concealed acceptance of the shear wall reinforcement, install the external angle locator 1 at the external angle of the shear wall positioning wire frame, install the side wall locator 3 at the shear wall column wall positioning line 5, and use air nails The gun fixes the external angle locator 1 and the side wall locator 5 respectively on the lower concrete floor.
[0023] The external angle positioner 1 is composed of two positioning plates and two connecting plates 2, the ends of the two posit...