Method of controlling foundation ditch deformation breaking up whole into parts
A technology that can be divided into parts and foundation pits is applied in the field of controlling the deformation of foundation pits and controlling the deformation of foundation pits into parts. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0019] 1. Project introduction and surrounding environment
[0020] After a subway station is completed, it transfers in parallel with another subway station that is already in operation. The maximum distance between the two stations is only 5.4m, and the two stations share the diaphragm wall of the original station structure at the west end of the well; the old station is a two-story underground station with an excavation depth of about 14m, while the new station is three-story underground with a maximum excavation depth 22.866m.
[0021] According to the "Shanghai Metro Foundation Pit Construction Regulations" (SZ-08-2000), the protection level of the foundation pit project of this station is Class I, that is, the maximum horizontal displacement of the enclosure wall is 0.14%H, and the maximum surface settlement is 0.1%H. The maximum excavation depth of the foundation pit is 22.866m, so the maximum horizontal displacement of the enclosure wall and the maximum surface settle...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com