Reconditioning tracks on asphalt pavement by using thin paste mixture of modified emulsified asphalt and construction method thereof

A technology of slurry mixture and emulsified asphalt, which is applied in road repair, on-site paved cohesive pavement, roads, etc. It can solve the problems of affecting traffic, many supporting equipment, and difficult to control.

Inactive Publication Date: 2005-10-26
西安高远公路养护技术有限公司
View PDF0 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The main disadvantages of these two kinds of repairing ruts are: the cutting grooves milled at the ruts of the asphalt pavement are wide and deep, the amount of materials used is large, the cost is high, there are many supporting equipment, the process is complicated, the progress is slow, the environment is polluted, and the operation is difficult. , difficult to control, long initial maintenance time, affecting traffic, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reconditioning tracks on asphalt pavement by using thin paste mixture of modified emulsified asphalt and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0091] Pave a single-layer modified emulsified asphalt slurry mixture on the rut of the asphalt pavement with a depth of 10-20mm. Taking 100kg of aggregate as an example, the raw materials and weight ratios used for paving the single-layer modified emulsified asphalt slurry mixture are as follows :

[0092] Fine stone chips 16kg

[0093] Medium and coarse stone chips 32kg

[0094] Coarse stone chips 52kg

[0095] Polymer modified cationic emulsified asphalt 11kg

[0096] water 12kg

[0097] Portland cement 3kg

[0098] Cationic styrene-butadiene polymer latex PC-1468 3kg.

[0099] The aggregate in the single-layer modified emulsified asphalt slurry mixture is composed of fine stone chips with a particle size of 0.075-3mm, medium-coarse stone chips with a particle size of 3-5mm, and coarse stone chips with a particle size of 5-10mm. The mixture of chips, in its ratio, the weight ratio of fine stone chips to medium coarse stone chips to coarse stone chips is 1:2:3.25, Port...

Embodiment 2

[0140] Pave a single-layer modified emulsified asphalt slurry mixture on the rut of the asphalt pavement with a depth of 10-20mm. Taking 100kg of aggregate as an example, the raw materials and weight ratios used for paving the single-layer modified emulsified asphalt slurry mixture are as follows :

[0141] Fine stone chips 20kg

[0142] Medium and coarse stone chips 40kg

[0143] Coarse stone chips 40kg

[0144] Polymer modified cationic emulsified asphalt 10kg

[0145] water 16kg

[0146] Portland cement 4kg

[0147] Cationic styrene-butadiene polymer latex PC-1468 2kg.

[0148] The aggregate in the single-layer modified emulsified asphalt slurry mixture is composed of fine stone chips with a particle size of 0.075-3mm, medium-coarse stone chips with a particle size of 3-5mm, and coarse stone chips with a particle size of 5-10mm. The mixture of chips, in its ratio, the weight ratio of fine stone chips to medium coarse stone chips to coarse stone chips is 1:2:5, Portlan...

Embodiment 3

[0169] Pave a single-layer modified emulsified asphalt slurry mixture on the rut of the asphalt pavement with a depth of 10-20mm. Taking 100kg of aggregate as an example, the raw materials and weight ratios used for paving the single-layer modified emulsified asphalt slurry mixture are as follows :

[0170] Fine stone chips 20kg

[0171] Medium and coarse stone chips 40kg

[0172] Coarse stone chips 40kg

[0173] Polymer modified cationic emulsified asphalt 13kg

[0174] water 8kg

[0175] Portland cement 1kg

[0176] Cationic styrene-butadiene polymer latex PC-1468 5kg.

[0177] The aggregates in the single-layer modified emulsified asphalt slurry mixture are composed of fine stone chips with a particle size of 0.075-3mm, medium-coarse stone chips with a particle size of 3-5mm, and coarse stone chips with a particle size of 5-10mm. The mixture of stone chips, in its ratio, the weight ratio of fine stone chips to medium coarse stone chips to coarse stone chips is 1:2:5, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
depthaaaaaaaaaa
particle diameteraaaaaaaaaa
particle diameteraaaaaaaaaa
Login to view more

Abstract

This is a kind of restoring the tracks of the bitumen road surface with the modified emulsified bitumen watery slurry mixed materials and its job practice. Spread single layer modified emulsified bitumen watery slurry mixed materials on the bitumen road surface of 10 - 20 mm depth, and spread double layer modified emulsified bitumen watery slurry mixed materials on the bitumen road surface of 20 - 40 mm depth. The job practice of single layer modified emulsified bitumen watery slurry mixed materials is: close down the traffic, process the original road surface, lay samples, spread, appearance control, joint slots, initial maintenance and quality inspection. Other building steps of the lower layer job practice of the double layer modified emulsified bitumen watery slurry mixed materials are the same as that of single layer, except that the allocated proportion of the single layer modified emulsified bitumen watery slurry mixed materials is different and without quality inspection. The upper layer building steps are: spread, initial maintenance and quality inspection. It has such advantages as high abrading-resistant performance, thin structure layer, long using life, high building speed, fast molding, short building period, fast traffic opening, long building season, low resource waste, no deleterious gas euduction and so on.

Description

technical field [0001] The invention belongs to the technical field of coagulating pavement paved on site for roads or airports, in particular to a pavement paved on site with several layers of different materials. Background technique [0002] With the rapid development of my country's economic construction, the construction of high-grade highways is also changing with each passing day. In 1985, starting from the construction of a first-class highway, in 1988, my country's first expressway, the Hujia Expressway, was completed and opened to traffic, and in 1990, the Shenyang-Dalian Expressway was opened to traffic. Over the next ten years, the development of my country's high-grade highways has grown linearly. So far, the mileage of highways in my country has been close to 35,000 kilometers, and the high-grade highways have exceeded 300,000 kilometers. The development momentum is very strong, but the maintenance work of high-grade highways is relatively lagging behind. At ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01C7/24
Inventor 乔朝增徐培华石颖岳学军来小林陈少飞
Owner 西安高远公路养护技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products