Underwater level throwing base construction method
A construction method and water depth technology, applied in water conservancy engineering, marine engineering, infrastructure engineering and other directions, can solve the problems of affecting the construction progress, endangering the safety of construction personnel and machinery, collapse of the embankment head, etc., to achieve the effect of reducing the loss of throwing materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0006] According to the test to determine the drift characteristics of the throwing material in moving water to determine the accurate positioning of the throwing ship. Different construction throwing ships have different drift characteristics.
[0007] Try to use a large-capacity throwing ship for one throwing to ensure that the coarsening degree of gravel meets the design requirements. Since the throwing material forms a certain range of coarsening area at the bottom of the bed, according to the single-vessel throwing model test results and the designed underwater throwing filling range, underwater forming and other requirements, when organizing construction throwing, first of all, it should be avoided. Accumulative throwing at the same place; secondly, considering the inconvenience of frequently moving the ship’s position during specific construction, if the two throwing points forward and backward along the direction of water flow are thrown alternately, so that the coarse...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More