Automobile ceiling producing process
A production method and the technology of the car roof, which is applied in the field of car interior parts, can solve the problems of the sound absorption index not meeting the requirements, unfavorable vehicle lightweight, and heavy product weight, so as to improve operating efficiency, reduce the weight of the roof, The effect of high rigidity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Embodiment 1: The production process steps of the roof of Guangzhou Honda 05 ODY commercial vehicle are as follows:
[0020] Canopy specification: L2750*W1450MM
[0021] 1. Material laying. The ceiling base is made of low-density PU foam molding material, and the PU foam molding material is first cut according to the size of the ceiling, so that it is smooth and free of wrinkles;
[0022] 2. Roll glue. The glue rolling machine imported from Italy is used to roll the PU foam molding material of the roof base. The glue rolling machine has the function of double-sided glue, automatic heating, and can accurately control the amount of glue. The speed of the glue rolling machine: every 25 revolutions per minute, the distance between the upper and lower rollers of the rubber rolling machine: 7.0mm; the amount of glue applied: single side: 15g / m 2 ;
[0023] 3. Spray demineralized water. Spray softened water on the rubber-coated substrate above, using special softened wate...
Embodiment 2
[0033] Embodiment 2: The production process steps of the roof of Shenlong Fukang hatchback are as follows:
[0034] Canopy specification: L1680*W1220MM
[0035] 1. Material laying. The ceiling base is made of low-density PU foam molding material, 2. Rolling glue. Glue rolling machine speed: 30 revolutions per minute, distance between the upper and lower rollers of the glue rolling machine: 7.6mm; gluing amount: single side: 20g / m 2 ; 3. Spray demineralized water. Motor frequency: 30HZ, softened water volume: 210g / pc; 4. Material laying; 5. Compression molding. Molding temperature: upper mold temperature: 130°C, lower mold temperature: 135°C, molding pressure: 75kgf / cm 2 , Molding time: 55sec; 6. Cooling and shaping. Cooling time: 45~55sec; 7. Fabric fit. The fabric is made of non-woven fabric, laminating temperature: upper mold temperature: 140°C, lower mold temperature: 130°C, laminating pressure: 55kgf / cm 2 , Fitting time: 35sec; 8. Cooling and shaping. Cooling time:...
Embodiment 3
[0037] Embodiment 3: The production process steps of Shenlong Kaixuan roof are as follows:
[0038] Canopy specification: L1900*W1300MM
[0039] 1. Rolling glue: speed of glue rolling machine: 27.5 revolutions per minute, distance between upper and lower rollers of glue rolling machine: 7.3mm; amount of glue applied: single side: 18g / m 2 ;2. Spray softened water: motor frequency: 28HZ, softened water volume: 200g / pc; 3. Compression molding: molding temperature: upper mold temperature: 125℃, lower mold temperature: 130℃, molding pressure: 70kgf / cm 2 , Molding time: 53sec; 4. Cooling and setting: cooling time: 50sec; 5. Fabric bonding: bonding temperature, upper mold temperature: 135℃, lower mold temperature: 125℃, bonding pressure: 50kgf / cm 2 , Fitting time: 32sec; 6. Cooling and shaping: cooling time: 50sec; 7. Waterjet cutting: cutting water pressure: 45000psi, cutting air pressure: 5.0kg / cm 2 . 8. Attachment installation: pressure holding time: 12sec, opening and closing ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com