Construction method for foundation pit support utilizing prefabricated large-diameter pipe pile
a construction method and large-diameter technology, applied in foundation engineering, excavations, construction, etc., can solve the problems of long construction period, difficult to ensure construction quality, severe environmental pollution, etc., to reduce environmental impact, reduce construction period, and good retaining and protecting effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0058]The concept, the specific steps and the effect of the invention will be described hereinafter with reference to the figures and the embodiment, for understanding the invention easily.
[0059]As shown in FIG. 1, the embodiment discloses a construction method for foundation pit support utilizing prefabricated large-diameter pipe pile, including the following steps:
[0060]Step 1. Drilling hole for pipe pile at a preset position, while sinking a prefabricated pipe pile into the hole;
[0061]Specifically, as shown in FIG. 2, a retractable drill bit 4 is configured below the prefabricated pipe pile 1, and is powered by a power supply device through a spiral drill rod 3 set inside the prefabricated pipe pile 1. When the retractable drill bit 4 works for drilling, the hole 5 is produced for accommodating the prefabricated pipe pile 1, that is, using a drill bit set configured below the pipe pile to drill, and making it possible to sink the pipe pile into a hole drilled at the same time whi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


