Process of laying ground or roof rain water collecting system
A technology of rainwater collection and laying method, which is applied in the direction of roof drainage, roofing, and on-site paved condensing pavement, which can solve the problems of airtightness, inability to collect rainwater, and impermeable ground, etc., so as to enhance air permeability and save water resources , enhance the binding effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1: Laying of ground rainwater collection system:
[0031] Select a 10m*1m ground and lay it according to the following steps
[0032] 1) Tamp and level the ground;
[0033] 2) Lay 15cm stones on the ground and tamp and level them to form the gravel base 4, as shown in Figure 1,
[0034] 3) Use hydrogenated bisphenol A type epoxy resin and quartz sand with a particle size of 1 mm in a ratio of 1:10 and lay it on the gravel base 4, as shown in Figure 2, there are 5 strips with a certain slope on it. The air-permeable layer of the water collecting groove 6; and make the ridge platform 8 between the water collecting grooves be pointed, so that the rainwater can be collected into the water collecting groove 6; the waterproof layer forms a rainwater collecting groove at the bottom of the slope 7;
[0035] 4) Coat the surface of the air-permeable layer described in step 3) with a layer of air-permeable waterproof agent 5 (known water-repellent agent) to form an a...
Embodiment 2
[0041] Embodiment 2: the pavement method of roof rainwater collection system:
[0042] 1) use hydroxyl-containing acrylic resin and 1mm quartz sand in a ratio of 1:8 and lay it on the roof. As shown in Figure 4, a collection groove 7 is formed at the diagonal of the roof. The groove 7 divides the roof into two parts; these two parts of the roof are slopes inclined towards the collecting groove 7 and the water collecting place 8, so that the rainwater is collected into the collecting groove 7; a certain slope;
[0043] 2) Lay a layer of permeable base 2 on the waterproof layer 1 and level it; the material selection of permeable base 2:
[0044] Take 100 parts of quartz sand with a particle size of 0.9 mm, 1 part of diatomaceous earth, and 10 parts of adhesive; the adhesive is hydrogenated bisphenol A epoxy resin and hydrogenated bisphenol A epoxy resin with hydrophilic groups The resins are mixed in a ratio of 10:1.
[0045] 3) Laying permeable bricks 3 on the permeable base...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com
