Pretreatment technique for conductive cloth production
A conductive cloth and pretreatment technology, which is applied in fiber processing, textiles and papermaking, etc., can solve the problems of complicated production process, inconvenient operation, and many operating procedures, and achieve convenient operation, less operating procedures and simple technological process. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] A pretreatment process for the production of conductive cloth, which is characterized in that it includes the following steps in sequence: a: feeding materials; b: soaking glue at a constant temperature; c: pre-baking; d: high-temperature complexation; e: receiving materials. a: Loading, that is, prepare the conductive cloth material; b: Constant temperature dipping, that is, put the conductive cloth material of a into the equipment containing ionic palladium activation solution at a temperature of 25°C for 2 minutes; c: Pre-baking, that is, the above-mentioned After the conductive cloth material is impregnated at a constant temperature in b, it is pre-dried at 100°C for 1 minute; d: high temperature complexation, that is, the conductive cloth material is pre-dried at 150°C after being pre-dried in c. Carry out pre-drying treatment for 15 minutes; e: collection, that is, to collect the conductive cloth material that has passed through d.
Embodiment 2
[0013] A pretreatment process for the production of conductive cloth, which is characterized in that it includes the following steps in sequence: a: feeding materials; b: soaking glue at a constant temperature; c: pre-baking; d: high-temperature complexation; e: receiving materials. a: Loading, that is, prepare the conductive cloth material; b: Constant temperature dipping, that is, put the conductive cloth material of a into the equipment containing ionic palladium activation solution at a temperature of 23°C for 3 minutes; c: Pre-baking, that is, the above-mentioned After the conductive cloth material is impregnated at a constant temperature in b, it is pre-dried at 80°C for 1.5 minutes; d: high temperature complexation, that is, after the conductive cloth material is pre-dried in c, it is dried at 100°C Carry out pre-drying treatment for 17 minutes; e: collect material, that is, collect the conductive cloth material that has passed through d.
Embodiment 3
[0015] A pretreatment process for the production of conductive cloth, which is characterized in that it includes the following steps in sequence: a: feeding materials; b: soaking glue at a constant temperature; c: pre-baking; d: high-temperature complexation; e: receiving materials. a: Loading, that is, prepare the conductive cloth material; b: Constant temperature dipping, that is, put the conductive cloth material of a into the equipment containing ionic palladium activation solution at a temperature of 27°C for 1 minute; c: Pre-baking, that is, the above-mentioned After the conductive cloth material is impregnated at a constant temperature in b, it is pre-dried at 120°C for 0.5 minutes; d: high-temperature complexation, that is, the conductive cloth material is pre-dried at 200°C after being pre-dried in c. Carry out pre-drying treatment for 13 minutes; e: collect material, that is, collect the conductive cloth material that has passed through d.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More