Method for casting super-large single-material cast steel bearing roller above 100 ton
A super-large, back-up roll technology, used in casting equipment, equipment for feeding molten metal into casting molds, and manufacturing tools, etc., can solve the problems of casting forming difficulties, feeding difficulties, tensile stress cracks, etc., to avoid tensile stress. Cracks, avoidance of crack defects, reduction of shrinkage stress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The material used in this embodiment is 40Cr4, the liquidus temperature of this material is 1470°C, the pouring temperature is 1550°C, and the weight of the poured molten metal is 150 tons. The casting process is as follows:
[0040] 1) The tangential inner gate is used for rotary pouring, and the pouring cup and pouring system are designed according to the principle of smooth filling. 2) Composite riser, the height of the riser is 2800mm, of which the height of the sand mold is 1500mm, and the height of the refractory brick is 1300mm. 3) 4 times of box grouping, 4 times of pouring, 4 times of electric heating process. The final electric heating after the molten metal fills the gating system is 12h. 4) When the mold is assembled for the first time, it is assembled to the first section of the upper roll neck, and the molten metal is poured through the designed smooth filling and pouring system. Double runners are used to fill the mold at a pouring speed of 9 tons / min. ...
Embodiment 2
[0043] The material used in this embodiment is 40Cr4, the pouring temperature is 1540°C, and the pouring metal liquid weighs 155 tons. The casting process is as follows:
[0044] 1) The tangential inner gate is used for rotary pouring, and the pouring cup and pouring system are designed according to the principle of smooth filling. 2) Composite riser, the height of the riser is 2800mm, of which the height of the sand mold is 1400mm, and the height of the refractory brick is 1400mm. 3) 3 times of box grouping, 3 times of pouring, 3 times of electric heating process. The final electric heating after the molten metal fills the gating system is 13h. 4) When the mold is assembled for the first time, it is assembled to the second section of the upper roll neck, and the molten metal is poured through the designed smooth filling and pouring system. Double runners are used to fill the mold at a pouring speed of 10 tons / min. After the molten metal fills the second tank of the upper r...
PUM
Property | Measurement | Unit |
---|---|---|
Height | aaaaa | aaaaa |
Height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com