Process for fracturing energetic gas
A high-energy gas fracturing and fracturing technology, applied in the field of fracturing, can solve problems such as short validity period of measures, and achieve the effects of improving treatment effect, preventing closure and prolonging validity period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] When the high-energy gas fracturing construction pipe string is lowered to 50 meters away from the target layer, the pipe string is suspended; then the surface pipeline is connected, and the prepared sand-carrying fluid with proppant is pumped from the oil casing annulus at a low speed. The sand-carrying liquid is a quaternary ammonium salt surfactant of 1% (weight) long-chain fatty acid, and the proppant weight content is 25% in the sand-carrying liquid, and the proppant density is 1200Kg / m 3 , the particle size is 0.9-1.2mm, the proppant used is purchased from the market, the sand-carrying liquid is injected at a speed of 150L / min, and the oil casing annulus is filled; then the construction pipe string is lowered to the target layer, and the construction pipe string is seated. Detonate fracking.
Embodiment 2
[0021] When the high-energy gas fracturing construction pipe string is lowered to 40 meters away from the target layer, the pipe string is suspended; then the surface pipeline is connected, and the prepared sand-carrying fluid with proppant is pumped from the oil casing annulus at a low speed. The sand-carrying liquid is a quaternary ammonium salt surfactant of 2% (weight) long-chain fatty acid, and the proppant weight content is 20% in the sand-carrying liquid, and the proppant density is 1200Kg / m 3 , the particle size is 0.9-1.2mm, the proppant used is purchased from the market, and the sand-carrying liquid is injected at a speed of 190L / min to fill the oil casing annulus; then the construction pipe string is lowered to the target layer, and the construction pipe string is seated. Detonate fracking.
Embodiment 3
[0023] When the high-energy gas fracturing construction pipe string is lowered to 60 meters away from the target layer, the pipe string is suspended; then the surface pipeline is connected, and the prepared sand-carrying fluid with proppant is pumped from the oil casing annulus at a low speed. The sand-carrying liquid is a quaternary ammonium salt surfactant of 2.5% (weight) long-chain fatty acid, and the proppant weight content is 30% in the sand-carrying liquid, and the proppant density is 1200Kg / m 3 , the particle size is 0.9-1.2mm, the proppant used is purchased from the market, and the sand-carrying fluid is injected at a speed of 200L / min to fill the oil casing annulus; then the construction pipe string is lowered to the target layer, and the construction pipe string is seated. Detonate fracking.
[0024] Through the indoor simulation research test, it entered the field test in June 2007. A total of 11 wells were constructed, and the construction success rate was 100%. ...
PUM
Property | Measurement | Unit |
---|---|---|
Granularity | aaaaa | aaaaa |
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com