Sticking modified asphalt waterproof coiled material and adhesive, as well as preparation method and application thereof
A technology of modified asphalt and waterproof membranes, which is applied to roofs, water conservancy projects, and underwater structures using flexible materials, and can solve problems such as non-self-adhesive, difficult construction, and increased membrane and construction costs Strong adhesion, good waterproof effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0086] Formula: Polyester base 280g / m 2 ;
[0087] Polypropylene cloth 28g / m 2 ;
[0088] 100 # 25 parts of asphalt;
[0089] 10 # 20 parts of asphalt;
[0090] 8-12 copies of SBS;
[0091] SBR (or thermoplastic SBR) 1 to 2 parts;
[0092] 3-5 parts of natural rubber;
[0093] 1-3 parts of petroleum resin;
[0094] 3-5 parts of acid oil;
[0095] Talcum powder (filler) 25 parts.
[0096] Preparation:
[0097] (1), the preparation of semi-finished products (mixtures)
[0098] 100 # asphalt and 10 # After the asphalt is dehydrated and metered by the metering tank, it is poured into the mixture configuration tank. Raise the temperature to 180°C, add SBS (styrene-butadiene-styrene copolymer), SBR (styrene-butadiene rubber) or thermoplastic SBR (thermoplastic styrene-butadiene rubber), natural rubber, petroleum resin and acid oil. After melting, grind it with a colloid mill. Then, add talcum powder and stir to mix evenly. After 1 hour, take a sample for inspection....
Embodiment 2
[0108] Formula: Polyethylene base 400g / m 2 ;
[0109] Polyester cloth 20g / m 2 ;
[0110] 90 # 40 parts of asphalt;
[0111] 20 # 15 parts of asphalt;
[0112] 7-10 parts of APO;
[0113] 3 to 1 serving of APAO;
[0114] 0-2 parts of natural rubber;
[0115] SBR (or thermoplastic SBR) 3 to 5 parts;
[0116] 5-8 parts of petroleum resin;
[0117] 15 parts of talcum powder (filler);
[0118] Aluminum foil is commercially available.
[0119] Preparation:
[0120] (1), the preparation of semi-finished products (mixtures)
[0121] 90 # asphalt and 20 # After the asphalt is dehydrated and metered by the metering tank, it is poured into the mixture configuration tank. Raise the temperature to 220°C, add APO (amorphous olefin copolymer), APAO (amorphous a-olefin copolymer), SBR or thermoplastic SBR, petroleum resin and natural rubber. After melting, grind it with a colloid mill. Then, add talcum powder and stir to mix evenly. After 1 hour, take a sample for inspection. ...
Embodiment 3
[0133] Formula: Polyester base 320g / m 2 ;
[0134] Polyethylene cloth 32g / m 2 ;
[0135] 100 # 30 parts of asphalt;
[0136] 20 # 25 parts of asphalt;
[0137] 12-16 copies of APP;
[0138] Neoprene 0-5 parts;
[0139] 8-10 parts of petroleum resin;
[0140] 20 parts of acid oil;
[0141] Three-line oil 3-5 parts;
[0142] 20 parts of talcum powder (filler);
[0143] Polyethylene film (PE film) is commercially available.
[0144] Preparation:
[0145] (1), the preparation of semi-finished products (mixtures)
[0146] 100 # asphalt and 20 # After the asphalt is dehydrated and metered by the metering tank, it is poured into the mixture configuration tank. Raise the temperature to 200°C, add APP (amorphous propylene copolymer), petroleum resin, acid oil, third line oil and neoprene. After melting, grind it with a colloid mill. Then, add talcum powder and stir to mix evenly. After 1 hour, take a sample for inspection. The obtained qualified mixture is modified as...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology