Foundation treatment method combining vibration ramming compaction at shallow layer and blasting compaction at deep layer with well-point dewatering
A technology for well point dewatering and foundation treatment, which is applied in infrastructure engineering, soil protection, construction, etc. It can solve the problem that the ultra-static pore water pressure is not easy to dissipate, cannot function on soft soil foundation, and cannot achieve soil consolidation, etc. problems, to achieve the effect of good foundation reinforcement, high construction efficiency and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 , 2 , insert the well point pipe 1 vertically in a large area in the reinforced area, the well point pipe is inserted to a depth of 8-18m, the well point pipe 1 is connected to the main water collection pipe 2, the main water collection pipe 2 is connected to the vacuum pump 3, and the vacuum pump 3 is started to drain water The groundwater table is lowered, and the shallow foundation soil is consolidated. Pull out the well point pipe, arrange vibratory rolling machine 4 or dynamic ramming equipment 5 on the ground of the reinforced area, start the vibratory rolling machine 4 or dynamic ramming equipment 5 to make the shallow foundation soil in the reinforced area compact, and make the shallow layer The pore water in the soil skeleton is precipitated. Withdraw the vibratory rolling machine or dynamic compaction equipment, and drill a number of explosion holes 6 to 8 to 18m with a drilling rig. The explosion holes 6 are arranged in a triangle or quincu...
Embodiment 2
[0029] Such as figure 1 , 2 , insert the well point pipe 1 vertically in the reinforced area, the insertion depth of the well point pipe is 8-18m, the well point pipe 1 is connected to the main water collection pipe 2, the main water collection pipe 2 is connected to the vacuum pump 3, and the vacuum pump 3 is started to drain water to reduce the groundwater level , the shallow foundation soil is consolidated; the well point pipe is pulled out, and the well point explosion holes are drilled with a drilling rig for 6 to 8 to 18m. 6. Place one or several vertical tubular explosive packs 7 and lead out fuses 8 along the depth. The explosive packs 7 are blocked and separated with sand and gravel 9. The explosives in the packs are water-resistant plastic explosives, and the fuses 8 are ignited. Initiate the explosive package 7 in the blast hole of the deep foundation, make the deep foundation soil compact, and make the pore water in the deep soil skeleton separate out; arrange the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com