Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Implement method of integrated universal simulation test system for electric network scheduling and electric quantity collection

A technology for power grid dispatching and implementation methods, applied in signal transmission systems, software testing/debugging, information technology support systems, etc., can solve problems such as insufficient testing methods, few types of regulations, and low market share, etc., and achieve excellent and easy Maintainability and ease of use, ensuring long-term reliable use, and good scalability

Inactive Publication Date: 2010-12-01
WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

1. Manual testing is time-consuming and labor-intensive, and the cycle is very long;
2. Periodicity and repeatability, every time the main station system is replaced, it needs to be tested again;
3. The test is often carried out by the main station and the sub-station in different places, which is not intuitive and inefficient;
4. Manual operation, it is difficult to avoid mistakes
Since the above-mentioned products are mainly focused on the detection of communication equipment and the simple test of the protocol, the application area is relatively narrow, and the overall optimized access and debugging scheme from the sub-station to the main station has not been realized, so the market share of the above-mentioned products in the power supply department is not very high In addition, the lack of varieties of regulations and the lack of complete testing methods also limit the use of

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Implement method of integrated universal simulation test system for electric network scheduling and electric quantity collection
  • Implement method of integrated universal simulation test system for electric network scheduling and electric quantity collection
  • Implement method of integrated universal simulation test system for electric network scheduling and electric quantity collection

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses an integrated universal simulation test system for electric network scheduling and electric quantity collection, a telemechanical terminal is connected with a test control device through an instation network, an electrical energy remote terminal is connected with a plurality of electric energy meters. The simulation test system is provided with a portable computer,and has a function of processing the remote measurement, remote signaling, remote control data of an automatic SCADA system and electric energy meter data of a electric quantity collection terminal simultaneously or separately; a specification analysis function of the automatic SCADA system and electric quantity collection system; the specification is an usual specification, or is added with a plug-in card mode. By means of the technical scheme, the system has stable operation and perfect functions; the system is portable and is flexible to be employed; the system has high reliability and well expandability, openness, compatibility, and excellent maintainability and easytouse; it is capable of expanding and modifying the specification expediently, and it is capable of plugging and playing.

Description

Implementation method of a general simulation test system integrating power grid dispatching and power collection technical field The invention belongs to the technical field of power grid scheduling automation, in particular, the invention relates to a general simulation test system integrating power grid scheduling and power collection. In addition, the present invention also relates to an implementation method of the above test system. Background technique With the continuous growth of user demand and the continuous advancement of the power marketization process, the tasks of power supply enterprises to build, expand, and transform substations continue to increase. It has become inevitable to provide users with economical and high-quality electric energy services. At present, power dispatch automation and power energy systems are already indispensable systems in the power industry, and play a vital role in the safe, economical, high-quality and reliable operation of th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G08C17/02H02J13/00H02J3/00G06F11/36
CPCY02B90/2684Y04S40/143Y04S10/40
Inventor 开圣武林其友赵武章建智张爱萍蒋桐生李涛黄晟李华陈峰夏友斌
Owner WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products