Stress absorption band and construction method thereof
A technology of stress absorption zone and construction method, which is applied to roads, pavement details, roads, etc., can solve the problems of shortening the service life of the road surface, affecting the road traffic capacity, reducing the bearing capacity of the road surface, etc., so as to prolong the service life and reduce the maintenance cost of the road. , the effect of improving performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] (1) The old pavement structure layer 1 is sliced or paved longitudinally along the edge of the pavement (strength that can meet the specification requirements) into an inclined plane 11 at an angle α of 15°-45° to the vertical plane of the longitudinal cut, and the depth reaches the new pavement 2 Elevation 4 of the lower base or roadbed top surface; Similarly, the newly paved pavement structure layer and the stubble position of the old road 1 are also paved or sliced into an inclined plane 21 with an angle of 15°-45° with the vertical plane, so that the new and old pavement 11, 21 joints form an inverted trapezoidal or inverted triangular groove 3;
[0031] (2) Clean up the inverted trapezoidal or inverted triangular groove 3 (with a bottom width of 3 cm or more) formed by the above-mentioned new and old roads, spray the penetrating oil, and then fill the groove 3 with asphalt gravel or modified asphalt gravel , requiring layered treatment, each layer thickness is ...
Embodiment 2
[0034] Step (1), (2) are with embodiment 1;
[0035] Step (3): Lay the geosynthetic material 6 on the stubble position between the stress absorbing zone 3 after the rolling in steps (1) and (2) and the new and old road surfaces, and the geosynthetic material 6 is on the top of the stress absorbing zone groove 3 The outer pavement should not be less than 50cm, that is, the width of the geosynthetic material should be the width of the upper opening of the inverted trapezoidal or inverted triangular absorption belt, and then extend to both sides of the width of not less than 50cm, and then pave the same asphalt concrete 5 as the new pavement surface layer, and use a road roller Compact until the compactness required by the design is reached.
Embodiment 3
[0037] Such as figure 1 As shown, the present embodiment is the construction method when the construction requirement design document is to pave a layer of new road surface on the old road surface:
[0038] Step (1), (2) are with embodiment 1;
[0039] Step (3):
[0040] a) Slicing a layer 12 of the original old road surface stubble part, the slicing thickness should be consistent with the thickness of the surface layer 51 in the newly widened road surface, and the slicing width should not be less than 100cm;
[0041] b) Laying geosynthetics 6 at the stubble position between the stress absorbing zone 3 and the new and old road surface after step (1) and (2) rolling, the geosynthetics 6 can be made of glass fiber mesh, and the geosynthetics 6 is under stress The outer side of the upper opening of the absorption belt groove 3 is not less than 50cm, that is, the width of the geosynthetic material should be an inverted trapezoidal or inverted triangular absorption belt, and the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com