Embodiment Construction
[0014] Combining with the application of ALC board in the project of Shanghai World Financial Center (101-story building), the construction technology, control points, some detailed nodes and quality control measures are explained, so as to popularize the technology.
[0015] An autoclaved lightweight aerated concrete slab partition wall installation process according to the present invention comprises the following steps:
[0016] 1) Clean up the site, set out wires, and weld Z-shaped parts: According to the drawings and site positioning axis, bounce the position line of the ALC partition wall on the bottom of the floor (bottom of the steel beam) and the ground. If there is a deviation of more than 50mm, it is necessary to weld the angle steel with a specification of L63mm*6mm or more to strengthen the edge;
[0017] Among them, the steps of Z-shaped piece welding are:
[0018] (1) Paying off and snapping wires: According to the detailed Z-shaped piece layout drawing and the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com